Tuohy WorkStyles Скачать руководство пользователя страница 1

WORKSTYLES

INSTALLATION INSTRUCTIONS

Содержание WorkStyles

Страница 1: ...WORKSTYLES INSTALLATION INSTRUCTIONS ...

Страница 2: ...P ASSEMBLY 3 DATA PLATE ASSEMBLY 4 PANEL MOUNTED CANTILEVER CONNECTION 4 BASE ASSEMBLY 5 CASEGOOD ASSEMBLY 6 CREDENZA TOP ATTACHMENT 7 OFFSET CREDENZA TOP ATTACHMENT 8 RUNOFF ATTACHMENT 9 CUBBIES AND SURFACE SHELVING 10 TABLES 11 LOUNGE SEATING 12 FACE ADJUSTMENTS DRAWER INSTALLATION REMOVAL 13 ...

Страница 3: ...ER FRAME CONNECTION FIG 5 TOP TILE RETAINER CONNECTION FIG 3 OPTIONAL FOOT CONNECTION UNDERSIDE VIEW FIG 1 FIG 2 FIG 5 FIG 3 OPTIONAL FOOT SPACER FIG 4 WALL MOUNTED Z CLIP CONNECTION 8 32 x 5 16 PAN HEAD SCREW FIG 4 FIG 6 MIDDLE TILE RETAINER CONNECTION FOR DOUBLE PANELS FIG 7 BOTTOM TILE RETAINER CONNECTION 8 32 x 5 16 PAN HEAD SCREW FIG 6 FIG 7 8 32 x 5 16 PAN HEAD SCREW PANELS ARE MOUNTED 6 FRO...

Страница 4: ...N POWERWAY MOUNTING BAR CONNECTION 10 X 5 8 PAN HEAD SCREW IMPORTANT LOCKING CLIP MUST BE FULLY ENGAGED INSTALLING JUMPERS WHEN INSTALLING METAL PASSTHROUGH CABLES THOUGH 90 DEGREE CORNERS INSTALL EACH END THROUGH OUTSIDE OF CONNECTOR WITH COVER OFF CORNER CABLE CONNECTION ...

Страница 5: ...O SETTLE INTO LOWER RETENTION CLIPS COVER PANEL ATTACHMENT TOP AND END CAP ATTACHMENT INSTALL END CAPS PRIOR TO TOP CAPS TOP CAP ASSEMBLY END CAP ASSEMBLY 6 X 3 4 PAN HEAD SCREW END CAP RETAINER 6 X 3 4 PAN HEAD SCREW TOP CAP RETAINER NEOPRENE PADS OPTIONAL FEET PANELS ARE MOUNTED 6 FROM THE FLOOR DOUBLE PANEL X8 NEOPRENE PADS ...

Страница 6: ... WALL MOUNTED CANTILEVER CONNECTIONS COVER PANELS HIDDEN PANEL MOUNTED CANTILEVER PANEL MOUNTED CANTILEVER INSERT CANTILEVERS INTO SLOTS BETWEEN COVER PANELS AND CONNECT TO STRUCTURE PANEL FRAME DATA PLATE CONNECTION DETAIL INSERT BOTTOM AND PRESS DOWN ON SPRING CLIP AND SNAP INTO PLACE ...

Страница 7: ... 2 Turns Onto Bolt Repeat for Rest of Connection Holes Next Align All T Nuts so that they Match the Extrusion Being Connected Depress Into Channel Should Look Like This Before Further Tightening Takes Place ATTENTION As Initial Tightening of Each BSCS Begins T Nuts Must Pivot in Channel Engaging the Shoulders of T Nut Against the Walls of the Channel Pay Special Attention that Each T Nut Engages B...

Страница 8: ...CASEGOOD CONNECTION CASEGOOD TO BASE ASSEMBLY 10 x 3 4 PAN HEADS 9 x 1 3 4 FLAT HEAD SCREWS TIP BASES ARE BEST ATTACHED WHILE CASEGOODS ARE LAYING ON BACKS USE SPACERS OR BLOCKING NOT PROVIDED FOR CASEGOODS THAT ARE DIFFERENT DEPTHS ...

Страница 9: ...7 CREDENZA TOP ATTACHMENT 9 x 1 3 4 FLAT HEAD SCREWS 10 x 1 PAN HEAD SCREWS SEAT PADS ATTACH WITH TWO SIDED TAPE MULTIPIECE CREDENZA FIELD JOINT DETAIL UNDERSIDE VIEW ...

Страница 10: ...8 OFFSET CREDENZA TOP ATTACHMENT 9 x 1 3 4 FLAT HEAD SCREWS 1 4 20 x 1 2 FLAT HEAD SCREWS 14 x 1 FLAT HEAD SCREWS TAPE SQUARES ...

Страница 11: ...9 RUNOFF ATTACHMENT RUNOFF LEG ATTACHMENT UNDERSIDE VIEW BRIDGE PLATE ATTACHMENT UNDERSIDE VIEW 10 x 1 PAN HEAD SCREWS 10 x 1 PAN HEAD SCREWS ...

Страница 12: ...BBIES AND SURFACE SHELVING SURFACE SHELVING SITS ON WORKSURFACE 9 x 1 3 4 FLAT HEAD SCREWS CUBBY ATTACHMENT INSTALLER TO PREDRILL HOLES INTO SIDE OF TOWER AND ATTACH TO CUBBY WITH 9 x 1 3 4 FLAT HEAD SCREWS ...

Страница 13: ...11 TABLES TABLE TOP CONNECTION UNDERSIDE VIEW 12 x 1 PAN HEADS HEIGHT ADJUSTABLE TABLE TOP CONNECTION UNDERSIDE VIEW DO NOT LIFT TIERED TABLES BY TOPS DAMAGE WILL OCCUR 12 x 1 PAN HEADS ...

Страница 14: ...12 LOUNGE SEATING LOUNGE ASSEMBLY UNDERSIDE VIEW SEE 90 CONNECTION DETAIL ON PAGE 5 10 x 3 4 PAN HEADS ...

Страница 15: ... L R L Drawer front L R L R 0 0 Height adjustment Tilt adjustment 1 Press up on adjustment tab 2 Push towards back of drawer Maximum 3 1 8 rise of drawer front tool free Rotate the tilt adjustment lever on the rear of each runner to lift the back of the drawer and tilt the top of the drawer front forward Maximum 5 3 16 rise of drawer back tool free NOTE Height and tilt adjustments available with a...

Отзывы: