920.1020.12
3
TABLE OF
CONTENTS:
Page
Contents
IMPORTANT
READ IMPORTANT NOTICE ABOVE BEFORE BEGINNING THE
INSTALLATION OF THIS PRODUCT
2
Important Notices
4
Product Description & Specifications
5
STEP 1: Header Installation
6-7
STEP 2: Mounting The Operator & Control Assembly
8-9
STEP 3: Install The Arm Assembly - Standard Applications
10-14
STEP 4: OPTIONAL - Push Arm Installation With Increased Spring Tension
15
STEP 5: OPTIONAL - Pull Arm Installation With Increased Spring Tension
16-17
STEP 6: Adjusting The Mechanical Stops
18-20
STEP 7: Setting The Dip Switches
21
STEP 8: Wiring Connections
22
STEP 9: Adjusting The Control
23
STEP 10: 120 Volt AC Connection
24-27
STEP 11: Power On & Tune-In
28
Troubleshooting
28
Job Documentation & Closeout
29
Company Contact
30-31
Appendix - Adjusting The Chain Tensioner
31-38
Appendix – Wiring Diagrams
39
Appendix - Lock Relay Function
40-41
Appendix - Fire rated Door Application
42
Appendix - Tucker Logo Placement
Содержание SW10
Страница 11: ...920 1020 12 11 PUSH ARM ...
Страница 27: ...920 1020 12 27 SETUP BUTTON FLASHING RED LED ...
Страница 33: ...920 1020 12 33 APPENDIX WIRING DIAGRAMS SIMULTANEOUS PAIRS ...
Страница 35: ...920 1020 12 35 APPENDIX WIRING DIAGRAMS ELECTRIC LOCK APPLICATION ...
Страница 36: ...920 1020 12 36 APPENDIX WIRING DIAGRAMS SW10 PAIR WITH BEA PARALLAX SYSTEM ...
Страница 37: ...920 1020 12 37 APPENDIX WIRING DIAGRAMS SW10 Single Pair WIth BEA LZR Microscan Sensors ...
Страница 38: ...920 1020 12 38 APPENDIX WIRING DIAGRAMS SW10 Single With Push Plates Torpedo Sensors For Secondary Activation ...
Страница 42: ...920 1020 12 42 APPENDIX TUCKER LOGO ...