![Tubeline TL60ECV Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/tubeline/tl60ecv/tl60ecv_operators-manual_1179180049.webp)
15-2
Section 15: Option - Wireless Plastic Film Sensor -
TL60ECV
Wireless Film Sensor Transmitter Installation
Ensure all parts have been received. Refer to
Parts Manual
.
1. Ensure two (2) 1.5V AAA alkaline batteries are inserted into each transmitter
(A)
. See
Fig.1
.
NOTE:
When replacing batteries,
DO NOT
use
rechargeable batteries. These can interfere
with transmitter broadcasting.
2. Push magnet bushing
(C)
over closest roller
bearing collar
(D)
, backing off slightly to
avoid wearing on wrap carrier. Ensure the
magnet bushing is installed with set screws
towards inside edge for full contact with
roller bearing collar when tightened.
3. Drill holes through plastic wrap carrier
frame so that when transmitter is mounted,
it is 1/16” from tip of rare earth magnet.
See
Fig.2
.
4. Install transmitters on each plastic wrap
carrier frame with provided machine screws
and lock nuts
(B)
. Transmitter end marked
“MAGNET” positioned towards wrap carrier
rollers. See decal image to left.
C
A
B
B
D
Wireless Film Sensor Operation
•
Film sensor transmitter reads magnet bushing rotation as normal film dispensing.
•
When a plastic roll empties or film breaks, magnet bushing stops rotating as no film is passing
over its parent roller. The transmitter no longer senses magnet bushing rotation, signals the
control panel reciever board which in turn signals the hoop controlling solenoid to cut off hydraulic
flow to the hoop. This causes the wrap cycle to stop, ensuring no bales are pushed through the
wrap chamber without plastic film coverage.
Fig .1
Fig .2
Содержание TL60ECV
Страница 7: ...Intentionally Left Blank...
Страница 12: ...TL60ECV Section 2 Safety 2 3 Clearance Markers Part No DEAMBER Part No DERED...
Страница 13: ...2 4 Section 2 Safety TL60ECV Safety Decal Locations NOTE Decals shown are not to scale...
Страница 39: ...11 1 Section 11 Diagnostics TL60ECV Section 11 Diagnostics Manifold Solenoid Functions...
Страница 59: ...VII Imperial Torque Value Chart TL60ECV Imperial Torque Value Chart...
Страница 60: ...TL60ECV Metric Torque Value Chart VIII Metric Torque Value Chart...