
Operations in More Details
17
2
Unfold the 1 ft
x
5 ft fabric hood.
Continue with steps 3 through 10, beginning on page 14.
3 ft
x
3 ft Hood
To assemble and attach the 3 ft
x
3 ft hood, carefully follow these 10
steps:
1
Build the 3 ft
x
3 ft frame structure as shown in Figure 9 using four 2
ft aluminum frame tubing pieces, four 1 ft aluminum frame tubing
pieces, four right-angle tubing connectors, and four straight tubing
connectors. Remember to construct the frame so that all Velcro
surfaces face in (toward the center of the structure).
Notice
: Make sure that all support pole cups in the aluminum frame
tubing pieces are facing downward.
Figure 9: Diagram of 3 ft x 3 ft frame
2
Unfold the 3 ft
x
3 ft fabric hood.
Continue with steps 3 through 10, beginning on page 14.
Changing DIP Switch Settings
To change flow units and time constants, adjust the settings of the DIP
switches located inside the battery compartment. To gain access to the
DIP switches, first turn off the AccuBalance
®
capture hood and lay down
the instrument with the electronic meter facing down.
Remove the battery compartment cover by pulling up on the two latches.
Switches numbered 1 through 8 are located in the corner of the battery
compartment. To allow easier access to the switches, remove or tilt up
the battery pack. The DIP switches are shown in Figure 10.