
36
saue
Series 90
Inspections and Adjustments
8
8.1.4 Pressure Override (POR) Valve
Pressure Adjustment (Option for
180 Frame Size)
The Pressure Override Valve is explained in Sec.
2.4.10.
1. Install two 1000 bar (or 10,000 psi) pressure
gauges in the high pressure gauge ports (M1 and
M2). Install a 50 bar (or 1000 psi) pressure gauge
in the pump charge pressure gauge port (M3).
2. Start the prime mover and operate at normal
speed.
3. With the pump operating at approximately 20%
displacement, load the work function and note the
pressure as the POR valve operates (pump dis-
placement reduces to “zero”).
4. Adjustment of the pressure override setting is
made by loosening the lock nut with a 9/16 inch
hex wrench and turning the adjustment screw with
a 3/16 inch internal hex wrench. The POR setting
should be at least 50 bar (750 psi) below the high
pressure relief valve setting of the multi-function
valves for proper operation.
5. Following the adjustment, torque the lock nut to 43
Nm (32 lbf•ft).
6. Shut down the prime mover and remove the
gauges and install the gauge port plugs.
Pressure Over-Ride Valve for 180 Frame Size
Right Side View
Pressure Over-Ride Valve
Lock Nut
Adjusting Screw
90000828
CONTENTS
Содержание PTV100/72
Страница 11: ......
Страница 12: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 44: ......
Страница 54: ...Contents iv 032015 PN 4 ...
Страница 175: ...Troubleshooting 70 35 032015 PN 133 ...
Страница 187: ...Troubleshooting 70 47 032015 PN 145 ...
Страница 205: ...Warranty DX EMISSIONS EPA 19 12DEC12 2 2 TS1721 UN 15JUL13 90 6 032015 PN 163 ...
Страница 208: ...Warranty Continued on next page DX EMISSIONS CARB 19 01AUG14 3 8 RG25841 UN 19MAY14 90 9 032015 PN 166 ...
Страница 209: ...Warranty Continued on next page DX EMISSIONS CARB 19 01AUG14 4 8 TS1723 UN 15JUL13 90 10 032015 PN 167 ...
Страница 212: ...Warranty Continued on next page DX EMISSIONS CARB 19 01AUG14 7 8 RG26035 UN 24JUN14 90 13 032015 PN 170 ...
Страница 213: ...Warranty DX EMISSIONS CARB 19 01AUG14 8 8 RG26036 UN 24JUN14 90 14 032015 PN 171 ...
Страница 214: ...Warranty 90 15 032015 PN 172 ...
Страница 220: ...Engine Registration IBC 2 032015 PN 178 ...
Страница 223: ...Engine Registration IBC 5 032015 PN 181 ...
Страница 224: ...Engine Registration IBC 6 032015 PN 182 ...
Страница 225: ...SERVICE MANUAL ...
Страница 262: ...saue Axial Piston Pumps and Motors Service Manual Series 90 CONTENTS ...
Страница 348: ...saue 87 Series 90 Exploded View Parts Drawings 10 Notes CONTENTS ...
Страница 350: ......
Страница 351: ......
Страница 352: ......
Страница 353: ......
Страница 354: ......
Страница 355: ......
Страница 356: ......
Страница 357: ......
Страница 358: ......
Страница 359: ......
Страница 360: ......
Страница 361: ......
Страница 362: ......
Страница 363: ......
Страница 364: ......
Страница 365: ......
Страница 366: ......
Страница 367: ......
Страница 368: ......
Страница 369: ......
Страница 370: ......
Страница 371: ......
Страница 372: ......
Страница 373: ......
Страница 374: ......
Страница 375: ......
Страница 376: ......
Страница 377: ......
Страница 378: ......
Страница 379: ......
Страница 380: ......
Страница 381: ......
Страница 382: ......
Страница 383: ......
Страница 384: ......
Страница 385: ......
Страница 386: ......
Страница 387: ......
Страница 388: ......
Страница 389: ......
Страница 390: ......
Страница 391: ......
Страница 392: ......
Страница 393: ......
Страница 394: ......
Страница 395: ......
Страница 396: ......
Страница 397: ......
Страница 438: ......
Страница 439: ......
Страница 440: ......
Страница 441: ......
Страница 442: ...www dexteraxle com OPERATION MAINTENANCE SERVICE MANUAL 9 000 15 000 lb Axles Related Components ...