Who does what?
All the conditions described in this chapter must be fulfilled
before the machine is delivered.
If this is not the case, Technical Service will not be able to put
the machine into service.
Note
During start-up, the main switch on the machine may only be
switched on by Technical Service.
The machine is put into service by Technical Service.
Start-up includes:
■
Installing, aligning, leveling and securing the machine.
■
Connecting the machine to the supplies (with the exception
of the electrical power supply).
■
Putting the machine into service.
■
Performing a functional test.
■
Instructing personnel.
B579EN
BendMaster installation conditions (60)/(150) -
Version 10
2
‐
3
Customer
Technical Service
Содержание BendMaster 150
Страница 1: ...Operator s manual BendMaster TruBend Cell 5000...
Страница 2: ......
Страница 3: ...Operator s manual BendMaster TruBend Cell 5000 Original operator s manual Edition 2015 06 01...
Страница 6: ...II Before you proceed 2015 06 01 B579EN...
Страница 16: ...0 10 Table of contents 2015 06 01 B579EN...
Страница 44: ...1 28 Disassembly and disposal 2015 06 01 B579EN...
Страница 251: ...Chapter 6 Maintenance Technical Service 1 Maintenance overview 6 2 B579EN 2015 06 01 Maintenance Technical Service 6 1...