![Tru-Test WaterWell 2 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/tru-test/waterwell-2/waterwell-2_user-manual_1173823011.webp)
11
d
Slide the water supply insulation tube over the ¾ inch flex line and vertical water supply line, making sure that the
insulation tube reaches up to the valve.
0
Step 6: Preparing the tank
a
Turn the tank on its side.
b
Apply the foam tape 1 to position 1 on the bottom of the tank, around the outside edge (recessed channel), of the hole on
the bottom of the tank (where the thermal earth tube will align).
c
Apply the foam tape 2 to position 2 on the bottom of the tank, around the outside edge (recessed channel).
d
Foam tape 3 is pre-installed under the tank top lid, and no further installation is required.
e
Finally, apply the foam tape that shipped with the reservoir lid.
f
Unscrew the WaterWell valve or disconnect it from the tank. Remove the valve mounting plate assembly by unscrewing
the three hex bolts.
g
Lift the tank and carefully place it over the vertical water supply line and ¾ inch flex line, so that the ¾ inch flex line comes
up through the tank top opening. The end of the ¾ inch flex line should be 2-3 inches above the opening. This allows
room to make connections to the valve. Excess line will be pushed back down into the tank bottom later.
Содержание WaterWell 2
Страница 18: ...18 Valveand float...
Страница 20: ...20 Notes...
Страница 37: ...37 V lvula y flotador...
Страница 39: ...39 Notas...
Страница 40: ...40 Notas...