background image

Pre-Installation Instructions 
8014 Trotec Speedy 500 

Laser Machine Requirements 

13/12/2011 

Trotec Produktions- und Vertriebs GmbH

_Linzer Strasse 156, A-4600 Wels, Austria, Technical Support 

4 / 15 

 

tel_+43 (0)7242 239-7000, fax_+43 (0)7242 239-7380, mailto: 

[email protected]

 

1.3   Unloading of the crate and machine 

The Speedy 500 is transported in a wooden crate. 
A suitable fork-lift is required to unload from the courier vehicle and lift the machine off its pallet. 
A powered screwdriver with cross-head bit is recommended for dismantling the wooden crate. 
If possible keep the packaging in case the machine ever needs to be relocated or shipped for any 
reason. 
Perform the following steps to unpack the machine properly: 

1  Dismantle top and rear of the crate. 

Remove all tables and accessory found in the 
slots on the rear. 

 

 

 

 

 

3  Remove the front and side plates. 

Remove the transportation safety device. 
Front: mid, back: left, right, mid (PSU-vat) 

 

 

 

 

 

 

 

 

Open door on the front door of 
Speedy500 (10mm Allen-Key). 

Follow the safety instructions!

 

 

 

 

 

Caution: 
Lift only on indicated lifting points! 
 
Lifting the machine on any 
other point will cause 
extensive damage.

 

 

 
Only lower the machine onto an even surface. 

 

Lift Speedy 500 with forklift on 
indicated lifting points. Adjust rollers 
and feet as necessary. 

Remove the transportation safety device of the 
x-axis. 

 

 

 

 

9  The machine must be allowed to stand for 24 hours before use. 

Содержание Speedy 500

Страница 1: ...Pre Installation Instructions 8014 Trotec Speedy 500...

Страница 2: ...peedy 500 5 1 5 Operating Environment and Safety 6 1 6 Electrical Requirements 7 1 7 Electrical Connection 9 1 8 Gas Requirements for Gas Kit 10 2 Computer and Software Requirements 11 2 1 Minimum Com...

Страница 3: ...o techsupport troteclaser com 1 Laser Machine Requirements 1 1 Transportation and Handling Dimensions of wooden crate W x D x H 2160 x 1810 x 1490 mm 85 5 x 71 5 x 59 inches Forklift requirement for u...

Страница 4: ...chine ever needs to be relocated or shipped for any reason Perform the following steps to unpack the machine properly 1 Dismantle top and rear of the crate 2 Remove all tables and accessory found in t...

Страница 5: ...aser com 1 4 Floor plan for the Speedy 500 It is necessary to have sufficient clear space to the sides front and rear of the machine for installation operation and maintenance Top View 1000mm 39 37 10...

Страница 6: ...ature conditions Therefore once the system has been moved to the desired area it must be allowed to stand for 24 hours before use Rapid changes of temperature during operation can risk condensation fo...

Страница 7: ...the desired frequency The following table provides information regarding power requirements which depends on the laser tube specification ac air cooled tube wc water cooled Laser Power Voltage Fuse Fr...

Страница 8: ...th the following cable for mains supply connection depending on laser tube specification and region 60Wac 60Wwc 75Wac 85Wac 95Wac 105Wac 120Wac 120Wwc 200Wwc EU 86956 USA 5664 UK 16369 39886 Part Desc...

Страница 9: ...l as voltage spikes can cause interference and possible damage to the electronics of the laser system It is better to connect the laser system to a dedicated electrical line It is highly recommended t...

Страница 10: ...for Gas Kit An external gas or compressed air supply is required for machines with gas assist as well as for applications where the amount of air provided by the internal compressor is too small The f...

Страница 11: ...ows 7 32 64 bit or Windows Vista 32 64 bit with Service Pack 1 or later or Windows XP 32 64 bit with Service Pack 2 or later 512 MB of RAM 400 MB of hard disk space Pentium 1 GHz processor or AMD Athl...

Страница 12: ...nd the line thickness object dimension exceeds 0 2 mm items will be engraved if the smallest possible line thickness that your Desktop publishing program offers is chosen e g 0 001mm hairline in Corel...

Страница 13: ...e exhaust system The laser power interacting with the work piece will be reduced by fumes and dust accumulating in the machine This will be avoided by a capable exhaust system Depending on the type of...

Страница 14: ...230 1x230 1x230 1x115 1x115V 1x230 Frequency Hz 50 60 50 60 50 60 60 50 60 Phases L N Ground L N Ground L N Ground L N Ground L N Ground L N Ground Power consumption W 900 W 1800 W 3000 900 1800 3000...

Страница 15: ...n 20cm 2 Set up a Fork lift compare label lift here b Footprint c Unpack take care on tables d Retention time 24h at ambient temperature unpacked e Alignment with level water level min 20cm 3 Connecti...

Отзывы: