SpeedMarker 300 /
ProMarker 300
Ausgabe 1.0
Technische Änderungen vorbehalten.
TROTEC Produktions- u. Vertriebs GmbH
Linzer Straße 156, A
– 4600 Wels
Seite
16
von 42
5
Before Commissioning
General Instructions
Read the Operation manual and ensure it is accessible at all times.
The ambient air temperature must be b5°C und +35°C and the relative air humidity not exceed
90% (non-condensing).
A laser system consists of high quality electrical and optical components. Mechanical stresses, vibrations
and impacts must always be avoided.
If the system has been subject to significant temperature variations, it must be brought back to room tem-
perature before being commissioned.
There must be sufficient air supply to the 19” module. The accumulation of heat due to covered ventilation
slots or filter pads can damage the system.
The operating personnel must read and understand the Operation manual, in particular the chapter on
"Safety Instructions". It is recommended that the operator compiles with in-house instructions regarding
safety and operation and that the receipt of these instructions/Operation manual and the participation in
briefings/training courses is confirmed in writing.
Laser marking may generate gases, fumes and other reaction products on the surface of the material. The
operator must therefore use an effective extraction system.