Routine Jack Maintenance Bulletin
TO PROVIDE COMPLETE INFORMATION ON SERVICING
ColumbusJACK/REGENT QUALITY GROUND HANDLING EQUIPMENT
BULLETIN RJM 170
– SUGGESTED PREVENTATIVE MAINTENANCE FOR JACKS
The following Preventative Maintenance Schedule is provided as a guide to insure that hydraulic aircraft jacks are always
ready for operation. The time intervals listed are a general recommendation only. The actual interval used should include
factors for the climatic conditions in which the equipment is stored and the frequency of equipment use.
Prior to Operation
1. Inspect for damaged or missing components.
2. Inspect for oil leakage and proper fluid level.
3. Inspect screw extension for mechanical stop.
4. Inspect all snap rings for engagement into grooves.
5. Inspect jack adapter for damage.
Every 6 Months
1. Inspect for worn snap ring grooves.
2. Change hydraulic filters if applicable.
3. If jack has not been used regularly, cycle jack without load.
4. Grease all lube fittings with a general purpose grease.
5. Wipe down ram(s) and screw extension with hydraulic oil.
Every 12 Months
1. Calibrate pressure gauge if applicable per RJM 173.
1. Perform "Recommended Annual Jack Certification Procedure" per RJM 147.
Содержание Columbus Jack 2295-10PR
Страница 2: ...REVISION DATE TEXT AFFECTED 01 01 2019 Original release ...
Страница 10: ...Model 2295 10PR 9694 010 95 Ton 86 Metric Ton Alligator Axle Jack 01 2019 Rev 01 Page 1 Hydraulic Schematic ...
Страница 26: ......
Страница 27: ...APPENDIX I Routine Jack Maintenance Bulletins ...
Страница 28: ......