
Installation & Assembly Instructions
Please contact our Customer Service Division with any questions at:
30700 D Carter Street ∙ Solon, OH 44139 ∙ (P) 440.248.5480 ∙
For a full line of products visit
1
INLBD2107
Read all instructions completely before installing. Should you have any questions about your installation,
please call Customer Service at 440-248-5480
Review Carton Contents:
2 Pcs. LocBoard Pegboard 24" x 42.5" (BKit= Blue, RKit=Red, Kit=White)
63 Pcs. Assortment of LocHook® Pegboard Hooks
1 Pk. Wall Mounting Hardware
•
Boards can be positioned side by side or in separate location in vertical or horizontal mounting
positions.
•
Pegboards fasten directly to concrete, solid wood and hollow wall structures without the use of
furring strips.
•
Pegboards are designed with internal mounting flanges that keep mounting hardware hidden from
sight and add to the board’s structural integrity and holding power.
•
If installing to bare studs you will need to install wood headers before completing installation.
LocBoard™ Installation:
Tools needed for Installation (not supplied with kit)
Level, marker, 7/32” standard or masonry drill bit, 7/64”
drill bit for wood studs, #2 Phillips head screw driver,
power drill.
For drywall, hollow concrete wall installation:
Use (12 each) plastic drywall anchors and #8 Phillips head
wood screws (SUPPLIED WITH THIS SYSTEM). If installing to bare studs you will need to install wood headers
before completing installation using wood screws only. NOTE: Always install one board at a time.
1. (IMPORTANT!) Select wall location for your LocBoards and the desired vertical or horizontal mounting
pattern you wish to mount in. When selecting a location for mounting always make sure that mounting
locations do not fall in line with, are adjacent to or interfere with any internal or external electrical wiring,
wall mounted or built-in electrical appliances, heaters, gas lines, ductwork or plumbing inside of wall, or are
located on the opposite side of any wall surface from where you are mounting. If you are unsure, please
consult a professional before proceeding with installation.
2. There are twelve screw holes on the back of your LocBoard that are accessible through the square holes
on the front (see images on back).
3. Place one LocBoard flat against wall surface, while using a level to make sure your board is straight and
squared.
Mark a minimum of of 2 mount hole locations per bracket using figure 1-1: Note: Installation for
first board should be completed before marking mounting holes for the second board.
4. Pre-drill holes for #8 wall anchors marked in Step 3 using 7/32" standard or masonry drill bit depending
on wall surface. If you hit a wood stud stop drilling and using a 7/64” drill bit create a pilot hole for the
wood screw, Note: avoid over-drilling holes. (Plastic wall anchors should fit snug.)
5. In
sert plastic wall anchors in each hole drilled in Step 4 except where you drilled 7/64” pilot hole for
wood stud.
6. Align mounting holes in wall surface with screw holes in back of LocBoard. Insert wood screws through
the front square opening and into pre-installed plastic wall anchors. Tighten all screws. The head of each
screw should not be visible and will be tight against inside surface of each mounting flange.
LB2-Kit, BKit, RKit, - (2) 24” x 42-1/2” LocBoard®(s), 63 Hooks