I
nstallatIon
IInstalling and replacing the lamp
Before replacing the lamp, unplug mains lead and let the lamp cool down (approx. 5 minutes).
During the installation do not touch the glass-bulbs bare-handed. Please follow the lamp manufacturer’s
notes.
Do not install lamps with a higher wattage! Lamps with a higher wattage generate temperatures the devi-
ce was not designed for. Damages caused by non-observance are not subject to warranty.
During the operation, the lamp reaches temperatures of up to 450° C. For the installation, you need a
230V/650W or 230V/1000W GX-9.5 lamp.
Lamp IInstalling
Step 1: Unscrew the fixation-screw of the protection-cover on the rear of the device.
Step 2: Remove the protection-cover.
Step 3: If replacing the lamp, remove the old lamp from the socket.
Step 4: Insert the new 230V/650W or 230V/1000W GX-9.5 lamp into the lamp-socket.
Step 5: Replace the protection-cover and tighten the screw.
Installing the Projector
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight
for 1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch
net. This secondary safety attachment must be constructed in a way that no part of the installation can fall
down if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on brid-
ges, under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by
an expert before taking into operation for the first time and after changes before taking into operation
another time.
The operator has to make sure that safety-relating and machine-technical installations are approved by
an expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by
a skilled person once a year.
IMPORTANT. Overhead rigging requieres extensive experience, including (but not limited to) calculating
working load limits, installation material being used, and periodic safety inspection of all installation mate-
rial and the device. If you lack these qualifications, do not attempt the installation yourself, but instead use
a professional structural rigger. Improper installation can result in bodily injury and or damage to property.
The manufacturer cannot be made liable for damages caused by incorrect installations or insufficient
safety precautions.
english
Manual de usuario / User Manual | PC 1000 Triton Blue | Rev. Jan.2016 | www.triton-blue.com Pg.9
Содержание Theatre PC TR-PC1000-2
Страница 2: ......