SecureMesh
TM
Extender Bridge
Installation Guide
Trilliant Incorporated
page 22 of 26
C
OMMISSIONING
T
HE
E
XTENDER
B
RIDGE
Configuring the SecureMesh Extender Bridge
Assuming the Extender Bridge is properly pre-provisioned, use of automatic provisioning as described in the
―Trilliant Network Element Management System (NEMS) Administration Guide‖ (Trilliant document number
TLT-CS-ADM-94) recommended.
Monitoring the Power-On Sequence
When power is supplied to the SecureMesh Extender Bridge, it
starts a power-on sequence that can be monitored by observing
the pair of LED lights on the underside of the device.
The SecureMesh Extender Bridge must have access to a GPS
signal to complete its power-on sequence and start making
wireless network connections.
The power-on sequence takes
up to 15 minutes, depending on how quickly the device can
acquire a GPS signal.
The tables that follow provide detailed descriptions of device
states indicated by the LED lights. When both LED lights are
illuminated and steady, the Extender Bridge has successfully
connected to the wireless network.
Device State
Link LED (Green)
Activity LED (Amber)
startup in progress
slow staggered blinking of both LEDs
startup failure
off
on
initializing processor (and acquiring GPS
signal)
blinks 4 times; repeats cycle
blinks 4 times; repeats cycle
initialization failure
fast, synchronized blinking of both LEDs
successful initialization, but failure to
locate hello
on
off
successful initialization; heard hello
off
blinking based upon RSSI signal
level
successful initialization; link is not
optimized, or is in pre-authorization
slow blink
blinking based upon RSSI signal
level
successful initialization; link is in standby
state on RSSI
fast blink
blinking based upon RSSI signal
level
WAN connected
– NAN radio operational
on
on
WAN connected
– NAN radio not
operational
on
blinks 4 times; repeats cycle
Link LED
(Green)
Activity LED
(Amber)