33
Procedures:
•
The blower is tested.
•
The blower filter is replaced.
•
The plant alarm is tested.
•
The pump and float-switch are tested (If applicable).
•
The vents are cleared of any blockages.
•
The sludge level in the primary chamber is measured.
•
The diffuser manifold is adjusted if required (If applicable).
8.4
Production of sludge
Important
•
The de-sludging of the Tricel Novo is the responsibility of the homeowner.
•
There is the potential danger of falling into the tank during de-sludging when
manholes may be open
–
take all necessary safety precautions when de-sludging.
•
Do not allow machinery/traffic drive over the plant. Maintain a distance of at least 4
metres away from the covers on the Tricel Novo.
•
The access cover should never be left off an unattended Tricel Novo.
When the sludge is occupying 50% of the volume of the primary chamber de-sludging is required,
this is necessery when the sludge is 700mm deep. For de-sludging periods, which depends on the
occupancy of the dwelling, please refer to the table in section 3.1
‘Dimensions.’
Carry out de-
sludging with a vacuum tanker (Tricel recommend the use of a licensed company).
8.5
De-sludging (emptying the solid waste from the primary chamber)
•
Remove the de-sludging access covers.
•
Empty the Tricel Novo using a vacuum tanker. Ensure the removal of the solids with the
liquid.
•
Care must be taken not to damage the Tricel Novo with the hose of the vacuum tanker.
•
Replace the de-sludging access cover securely.
9
Operating conditions
Warning
Tricel shall not be liable for any damage or loss, including consequential loss, caused by the
failure of any plumbing equipment or failure caused by the inclusion of prohibited
material in the plant.
The manufacturer’s installation, operation and maintenance instructions o
utlined in this manual
must be followed at all times to ensure the plant operates as designed. Any variations to these
conditions could result in the unit not performing to its full potential, and the discharge may not
Содержание Novo UK10
Страница 1: ...0 106 Rev 11 Dec 2017 Tricel Novo UK6 50 Wastewater Treatment Plants Engineering a green future...
Страница 4: ...3...
Страница 5: ...4...
Страница 10: ...9...
Страница 11: ...10...
Страница 26: ...25 5 11 1 Electrical Diagrams 5 11 1 1 Tricel Novo Gravity Outlet UK6 UK8 UK10 UK12 Control Panel No 209102...
Страница 27: ...26 UK18 UK24 Control Panel No 209116...
Страница 28: ...27 UK30 UK36 UK42 UK50 Control Panel No 209111...
Страница 29: ...28 5 11 1 2 Tricel Novo Pumped Outlet UK6 UK8 UK10 UK12 UK18 UK24 Control Panel No 209101...
Страница 30: ...29 UK30 UK36 UK42 UK50 Control Panel No 209112...
Страница 42: ...41 12 Terms conditions Subject to our standard terms and conditions which are available on request...
Страница 43: ...42...