HARDWARE NEEDED
TP-1- 1 1/2” Coated Deck Screw-
(36)
PARTS NEEDED
406-6- 19 1/2” Side Panel End Board- (2)
406-5- 18” Side Center Panel Board-
(1)
406-4- 10 1/2” Side Center Holder-
(1)
406-18- 19 1/2” Side Shutter Board-
(4)
406-11- 60 1/4” Side Facia-
(1)
CC-057- 14” Side Left Shutter-
(2)
CC-058- 14” Side Right Shutter-
(2)
Rockwall Side Treehouse Panel
11
1/8
” G
ap
3 7/16” G
ap
40
6-
18
40
6-5
40
6-4
40
6-
6
CC
-05
7
CC
-0
58
406-11
TP-1
Содержание 5.8 Bengal Fort
Страница 1: ......
Страница 78: ...Finished Playhouse Install with Open Rails Finished Playhouse Install with Closed Rails...
Страница 86: ......