HARDWARE NEEDED
SB-5- 1/2” x 9” Carriage Bolt-
(1)
SB-4- 1/2” x 7” Carriage Bolt-
(1)
SB-19- 3/4” USS Flatwasher-
(2)
SB-18- 1/2” USS Flatwasher-
(2)
SB-16- 1/2” Split Lockwasher-
(2)
SB-7- 1/2” Hex Nut-
(2)
SB-2- 1/2” Acorn Nut Plated-
(2)
SB-17- 3/8” USS Flatwasher-
(2)
SB-12- 3/8” x 5” Hex Lag Screw-
(2)
PARTS NEEDED
A-Frame Assembly-
(1)
Bengal Fort Main Assembly
A-F
ram
e
ATTACH AND LEVEL THE A-FRAME
AFTER ATTACHING AND LEVELING SECURE AS SHOWN
SB-4
SB-19
SB-
18
SB-1
6
SB-7
SB-2
SB
-1
2
SB
-1
7
SB-
5
Содержание 5.8 Bengal Fort
Страница 1: ......
Страница 78: ...Finished Playhouse Install with Open Rails Finished Playhouse Install with Closed Rails...
Страница 86: ......