HARDWARE NEEDED
A-1- 3/8” Acorn Nut Plated-
(4)
A-5- 3/8” Hex Nut-
(4)
A-9- 3/8” Split Lockwasher-
(4)
O- 3/8” USS Flatwasher-
(4)
P- 1/2” USS Flatwasher-
(4)
A-3- 3/8” x 5” Carriage Bolt-
(4)
D- 2 1/2” Coated Deck Screw-
(4)
C- 2” Coated Deck Screw-
(8)
PARTS NEEDED
CC-107- 48 1/8” Wood Roof Support-
(4)
CC-053- 9 9/16” Wood Roof Peak-
(2)
Bengal Fort Main Assembly
C
D
CC
-1
07
CC
-05
3
A-
3
P
O
A-
5
A-9
A-1
Содержание 5.8 Bengal Fort
Страница 1: ......
Страница 78: ...Finished Playhouse Install with Open Rails Finished Playhouse Install with Closed Rails...
Страница 86: ......