HARDWARE NEEDED
I- 3/8” x 5” Hex Lag Screw-
(2)
O- 3/8” USS Flatwasher-
(2)
PARTS NEEDED
CC-143- 11” Rope Block-
(1)
404-F- 14’ Yellow Rope-
(1)
Bengal Fort Main Assembly
404-F
CC
-14
3
I
O
SLIDE 404-F THROUGH CC-143 AND TIE A KNOT HOLDING IT IN PLACE.
WORK YOUR WAY DOWN TYING A KNOT EVERY 2 TO 3 FEET UNTIL YOU
STRING THE ROPE THROUGH CC-087 AND TIE A KNOT SECURING THE
ROPE TO THE ROCKWALL.
Содержание 5.8 Bengal Fort
Страница 1: ......
Страница 78: ...Finished Playhouse Install with Open Rails Finished Playhouse Install with Closed Rails...
Страница 86: ......