HARDWARE NEEDED
A-4- 1/2” x 7” Carriage Bolt-
(4)
Q- 3/4” USS Flatwasher-
(4)
P- 1/2” USS Flatwasher-
(4)
M- 1/2” Split Lockwasher-
(4)
A-6- 1/2” Hex Nut-
(4)
A-2- 1/2” Acorn Nut Plated-
(4)
H- 3/8” x 3 1/2” Hex Lag Screw-
(8)
O- 3/8” USS Flatwasher-
(8)
PARTS NEEDED
CC-166- 104” Trapeze Arm-
(1)
404-46- 119 1/2” Corner Post-
(2)
CC-187- 60 1/4” Mainbeam-
(1)
CC-125- 60 1/4” 4- Hole Facia-
(2)
Trapeze Side Wall
CC-1
66
40
6-4
6
CC-187
CC
-12
5
H
O
A-4
Q
P
M
A-6
A-2
A-2
A-6
M
P
Q
A-4
Содержание 5.8 Bengal Fort
Страница 1: ......
Страница 78: ...Finished Playhouse Install with Open Rails Finished Playhouse Install with Closed Rails...
Страница 86: ......