HARDWARE NEEDED
A-4- 1/2 x 7” Carriage Bolt-
(2)
Q- 3/4” USS Flatwasher-
(2)
P- 1/2” USS Flatwasher-
(2)
M- 1/2” Split Lockwasher-
(2)
A-6- 1/2” Hex Nut-
(2)
A-2- 1/2” Acorn Nut Plated-
(2)
H- 3/8” x 3 1/2” Hex Lag Screw-
(4)
O- 3/8” USS Flatwasher-
(2)
PARTS NEEDED
CC-165- 38 7/8” Center Upright-
(1)
CC-148- 19” Right Gusset-
(1)
CC-149- 19” Left Gusset-
(1)
Swingbeam Side Wall
CC-
165
CC-149
CC
-14
8
A-2
A-6
M
P
Q
O
H
A-4
Содержание 5.8 Bengal Fort
Страница 1: ......
Страница 78: ...Finished Playhouse Install with Open Rails Finished Playhouse Install with Closed Rails...
Страница 86: ......