HARDWARE NEEDED
SB-9- 3/8” x 10” Hex Bolt-
(1)
SB-20- 3/8” Bolt Cup-
(9)
SB-17- 3/8” USS Flatwasher-
(9)
SB-15- 3/8” Split Lockwasher-
(9)
SB-6- 3/8” Hex Nut-
(1)
SB-1- 3/8” Acorn Nut Plated-
(9)
SB-8- 3/8” x 7” Hex Bolt-
(8)
SB-13- 3/8” Nylon Insert Locknut-
(8)
PARTS NEEDED
(1)
(1)
(1)
(1)
CC-2
4
0- 7 7/8” Center A-Frame Block-
CC-244- 13 3/8” A-Frame Block Sunk-
CC-243- 13 3/8” A-Frame Block-
CC-184- 132 5/8” Universal Swingbeam-
404-I- Ductile Iron Swing Hanger-
(4)
A-Frame Block Assembly
Beam Assembly
SB-9
SB-20
CC-
243
CC-
240
CC-
244
SB-17
SB-15
SB-6
SB-1
SB-8
SB-20
404-I
CC-184
SB-17
SB-15
SB-13
SB-1
Содержание 5.8 Bengal Fort
Страница 1: ......
Страница 78: ...Finished Playhouse Install with Open Rails Finished Playhouse Install with Closed Rails...
Страница 86: ......