6.4 & 7 Monkey Bar
Assembly
Set the Monkey Bar overhead on the deck(Fort) or line up the bottom of the Monkey
Bar Overhead with the top of the Deck(Playcenter) and insert Monkey Bar Overhead
in between the Corner Post and the Center Post. Make sure the ends of the Monkey
%DU2YHUKHDGLVÀXVKZLWKWKHLQVLGHRI&RUQHU3RVWDQG&HQWHU
3RVWDQGWKHQGULOOVHH
Figure 2) thru the Monkey Bar Overhead countersinks thru the Corner Post and Center
Post. (On a playcenter swingset you will need to remove the Gusset on the Corner Post
prior to drilling and then put the Gusset back on once all the Hardware is installed and
tightened.)
Place a 3/4” Flatwasher over a 1/2” x 7” Carriage Bolt and then insert thru
the hole into the countersunk hole in the Monkey Bar Overhead. Place a 1/2”
W
asher
,
1/2” Lockwasher over the 1/2” x 7” Carriage Bolt end inside the Monkey Bar Over
-
head.
Thread the 1/2” Hex Nut on to the 1/2”x 7” Carriage Bolt. Repeat this process on
the other side. Now tighten the 1/2” Hex Nuts, put on the 1/2”
Acorn Nut and lightly
tighten.
Do not over tighten.
Safety Handle Install
14” Gap
HARDW
ARE NEEDED
UMH-7- #14 x 2 “ Pan
Phillips-
(4)
UMH-9- 1/4” USS Flatwasher
-
(4)
UMA-2- 1 1/4” Playgrip Ladder Handles-
(2)
HARDW
ARE NEEDED
UMH-12- 3/4” USS Flatwasher
-
(2)
UMH-8- 1/2” Split Lockwasher
-
(2)
UMH-1
1- 1/2” USS Flatwasher
-
(2)
UMH-3- 1/2” Hex Nut-
(2)
UMH-1- 1/2”
Acorn Nut-
(2)
UMH-2- 1/2” x 7” Carriage Bolt-
(2)
UM
H-7
UMH-9
UMA-2
UMH-1
UMH-3
UMH-8
UMH-1
1
UMH-12
UMH-2
Содержание 5.4 Jaguar Playcenter
Страница 58: ...UMB 11 103 Left Support Leg QTY 1 UMB 10 103 Right Support Leg QTY 1 Universal Monker Bar Lumber...
Страница 61: ...7 Z 2NC ITKR 6WDGU 36 7PKXGTUCN QPMG CT EEGUUQTKGU 7 2NC ITKR CFFGT CPFNGU 36...
Страница 82: ...7 6GNGUEQRG 36 7PKXGTUCN QHV EEGUUQTKGU...
Страница 100: ...Universal Loft Wood Roof Assembly...