
Installing the SPI 3
10
Trebing & Himstedt | SPI 3 | MODBUS RTU
Installing the SPI 3
Mounting the SPI 3
– Place the SPI 3 with the gap onto the top-hat rail and swivel the SPI 3 downward
until the stop lever locks on the top-hat rail.
Warning!
Head space of 5 cm minimum for heat flow is required above and below the
SPI 3.
Dismounting the SPI 3
– Remove the connected supply and signal wires (serial, PROFIBUS, voltage).
– Stick a screwdriver in the slot of the stop lever at the SPI 3.
– Press the screwdriver in the direction of the SPI 3 while at the same time swivelling
the SPI 3 away from the top-hat rail.
Connecting up the power feed
Danger!
Incorrect grounding of the SPI 3 can injure personnel and damage
equipment.
Make sure that the SPI 3 is correctly grounded.
Warning!
Although the SPI 3 is protected against polarity reversal, connecting up the
power feed with incorrect polarity for extended periods can damage the
device. Make sure that the power feed is connected with correct polarity.
– Connect the cables for 24 V power feed, ground and protective ground to the
corresponding screw terminals 24 V, GND and PE.
SPI 3
Top-hat rail
Stop lever