TNX65/42
Installing the machine
Set up control cabinet on wheels
• Lightly position the four wheels to support the control cabinet on the
ground.
Remove transport retainers from the control cabinet
• Take out the fixing screw in the control cabinet.
• Unscrew the M12 cheese head screw at the turning point of the control
cabinet.
• Remove the locking plate on the machine bed / control cabinet.
(The locking plate must be retained by the customer in case the machine
has to be transported again).
• Unscrew the retaining bracket underneath the control cabinet from the
machine bed. The bracket remains connected to the control cabinet as a
limit stop.
Содержание TNX42
Страница 6: ...6 22 10 2021 TNX65 42 Table of contents...
Страница 8: ...8 10 2016 TNX65 42 Safety...
Страница 11: ...11 10 2016 TNX65 42 Installation and layout diagrams Installation diagram...
Страница 12: ...12 10 2016 TNX65 42 Installation and layout diagrams...
Страница 24: ...24 22 10 2021 TNX65 42 Preparing to transport a machine with milling unit Transport retainer tool changer...
Страница 42: ...42 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Страница 43: ...43 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Страница 44: ...44 22 10 2021 TNX65 42 Installing the machine...
Страница 52: ...52 10 2016 TNX65 42 Fuels...
Страница 54: ...54 10 2016 TNX65 42 Pneumatic connection...
Страница 56: ...56 05 2017 TNX65 42 Electrical connection...
Страница 62: ...62 10 2016 TNX65 42 Alignment component installation and commissioning...
Страница 63: ......