![Traub TNL20 Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101069.webp)
69
Transport and installation
TNL20
DTE022DE - 24.06.2021
Pneumatic connection
Provision of compressed air
For all work in connection with operating fluids, the information in
the datasheets of the respective manufacturers and the information
in the document
Notes on Operating Materials
must be observed.
The required amount of the operating materials to be filled can be
obtained from the relevant fluid diagrams.
The required compressed air is conditioned in a maintenance unit that requires
no adjustments.
Pressure gauges are available to check normal functionality.
Air consumption
The air consumption is influenced by the machine configuration and cycle time.
On average, approx. 300 Nl/min is set for a standard machine.
Содержание TNL20
Страница 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Страница 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Страница 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Страница 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Страница 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Страница 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Страница 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Страница 73: ......