17
Transport, Installation, Commissioning
TNL12.2
DTE070EN - 15.09.2021
Transporting the machine
Delivery of the machine
The machine is delivered by truck.
The machine is in the following condition when delivered:
– Machine incl. control cabinet mounted on the adjustable feet
– Certain moving parts on the machine, such as the work area door and the
swiveling operating panel, are secured by transport locks or were removed.
– Protruding machine parts hampering the transport may have been removed.
– All blank parts of the machine were treated by spray-covering with an anti-
rust agent.
– For operating material, see Chapter
Commissioning
.
Other separate units
Certain equipment levels or add-on equipment such as chip conveyor, bar feed-
er, bar loading magazine, etc., are usually separate units.
Chip conveyors usually rest on a transport base for shipping. The bar feeder and
bar loading magazine are delivered in a special shipping crate.
Loose parts, such as keys, tools, and fittings, are supplied in a separate box,
which may be included with a separate unit.
Before unloading, check the machine, the enclosed accessories, and any sepa-
rate units for external damages and completeness (compare bill of lading with
delivery form).
Have the carrier confirm any damages or missing parts on the bill of lading or
delivery form.
In case of damages during transport, it is recommended to take photos of the
damages for evidence.
Notify the machine manufacturer or the machine manufacturer's representative.
Содержание TNL12.2
Страница 6: ...6 Transport and installation TNL12 2 DTE070EN 15 09 2021 Table of Contents ...
Страница 8: ...8 Transport TNL12 2 DTE070EN 15 09 2021 Safety ...
Страница 16: ...16 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 General ...
Страница 32: ...32 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Transporting the machine ...
Страница 44: ...44 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Installing the machine ...
Страница 50: ...50 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Electrical connection ...
Страница 52: ...52 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Pneumatic connection ...
Страница 56: ...56 Transport installation commissioning TNL12 2 DTE070EN 15 09 2021 Commissioning ...
Страница 61: ......