12
Transport, Installation, Commissioning
TNL12.2
DTE070EN - 15.09.2021
General
Information on where the machine is installed
Risk of crushing
The installation site must be chosen such that moving parts of the
machine, including hand-operated doors, flaps, etc., do not create
risks of being crushed against walls, columns, or hall installations.
In any case, the machine, including the bar loading magazine, must
be doweled to the floor.
Space requirements
The following must be ensured:
• Sufficient free space around the machine.
• Sufficient movement space for the operator.
• Sufficient space for maintenance and repair.
• It must be possible to open all doors of the machine completely.
• Space for placing blank and workpiece pallets, workpiece containers, chip
trolleys, tool trolleys, etc.
Use the installation plan to determine the required space.
Environmental conditions
See
Environmental Conditions
in the safety instructions.
If the actual conditions at the installation site differ from these
specifications, be sure to contact the
machine manufacturer
or
its
representative
..
Subsoil, foundation
The load capacity and strength of the floor must be suitable for the machine
weight based on constructional aspects.
There must be no expansion joints in the area of the machine footprint.
Bar guides, bar feeders, and bar loading magazines must generally be anchored
in the foundation (for information, see the associated operating instructions and
the installation plan).
Содержание TNL12.2
Страница 6: ...6 Transport and installation TNL12 2 DTE070EN 15 09 2021 Table of Contents ...
Страница 8: ...8 Transport TNL12 2 DTE070EN 15 09 2021 Safety ...
Страница 16: ...16 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 General ...
Страница 32: ...32 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Transporting the machine ...
Страница 44: ...44 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Installing the machine ...
Страница 50: ...50 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Electrical connection ...
Страница 52: ...52 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Pneumatic connection ...
Страница 56: ...56 Transport installation commissioning TNL12 2 DTE070EN 15 09 2021 Commissioning ...
Страница 61: ......