U
NPACKING
,
E
QUIPMENT
L
OCATION
&
P
LACEMENT
1
I
NDOOR
S
COREBOARD
I
NSTALLATION
R
ECOMMENDATIONS
UNPACKING
For convenience and to prevent possible damage to equipment, unpack the shipping containers at
the installation site.
CAUTION:
The shipping crates and boxes must be unpacked on a sturdy and level floor.
Take all precautions to prevent equipment from tipping and cause possible
injury to personnel or damage to equipment.
SCOREBOARD & CONTROL
1.
Remove one side of the shipping crate.
See Figure 1.
2.
DO NOT
use box cutters to cut into the
shipping crate cover. Doing so may
damage the scoreboard contained in
the shipping box.
3.
The scoreboard may be top-heavy.
SAFETY PRECAUTION:
To prevent possible equipment damage
and/or personal injury, hook cables or
chains to the eyebolts or j-brackets
located near the top of the scoreboard to
prevent it from tipping.
4.
The control package is shipped inside
the scoreboard behind a digit panel
marked with removable labels.
Loosen the 4 screws to remove the
digit panel and remove the control
package.
5.
Reinstall the digit panel.
6.
Carefully slide the scoreboard from the
shipping crate.
SIGNS
1.
DO NOT
use box cutters to cut into the
shipping box as this may damage the
sign contained in the box.
2.
Remove the side boards of one side of
the shipping crate. See Figure 2.
3.
Remove the boxed sign from the
shipping crate.
4.
Carefully slide the sign from inside the
shipping box.
F
IGURE
1
–
U
NPACKING THE
I
NDOOR
S
COREBOARD
F
IGURE
2
–
U
NPACKING THE
S
IGN