NM2-FXS-2230-SFP-01 Install Guide
33730 Rev. C
https://www.transition.com
Page
6
of
14
Components Overview
Reference Views
Страница 1: ...ord Device and System Information 13 Contact Us 13 Compliance Information 13 Declaration of Conformity 14 Record of Revisions 14 Introduction The Transition Networks NM2 FXS 2230 SFP 01 is a 100 Base...
Страница 2: ...he NIC to the fiber adapter and a 100 Base FX to SGMII SFP module Features PCI Express M 2 compliant Flow Control A E keyed M 2 interface Wake on LAN WOL Full duplex Smart Load Balancing SLB IPv6 capa...
Страница 3: ...Width 1 65 42 mm x Depth 2 05 52 mm x Height 0 51 13 mm FFC Cable Length 6 15 3 cm without right angle bend 5 5 14 cm with right angle bend Power Consumption NM2 FXS 2230 SFP 01 120 mA at 3 3V 0 4 W t...
Страница 4: ...rameters See the full SFP manual for more details System Board Layout The OptiPlex 7040 Micro has two M 2 expansion slots one 22x30 slot 10 in below diagram and one 22x80 slot 13 in below diagram The...
Страница 5: ...NM2 FXS 2230 SFP 01 Install Guide 33730 Rev C https www transition com Page 5 of 14 NIC Hardware Installation Overview NIC Hardware Location...
Страница 6: ...NM2 FXS 2230 SFP 01 Install Guide 33730 Rev C https www transition com Page 6 of 14 Components Overview Reference Views...
Страница 7: ...Failure to observe this caution could result in damage to the NIC Before installing the NIC review the Pre Installation Checklist and Safety Precautions below Before installing the NIC ensure that sy...
Страница 8: ...s caution could result in damage to the NIC Before installing the NIC ensure that system power is OFF the power cord is unplugged from the power outlet and that proper electrical grounding procedures...
Страница 9: ...Assembly into Motherboard M 2 Edge Connector 5 Secure the M 2 NIC Assembly into place using the Securing Screw 6 Install the Fiber Optic Adapter into the VGA opening in PC Case as shown below 7 Attac...
Страница 10: ...dapter 12 Insert end of 20 Position FFC Cable into fiber optic adapter with Pins facing down 13 Push Locking Lever Down to Lock Check that Cable is secure See figure below for final placement 14 Gentl...
Страница 11: ...on for Windows Device Manager When you install the Intel PROSet software tabs are automatically added to the supported Intel adapters in Windows Device Manager These features allow you to test and con...
Страница 12: ...x User s Guide 7 Use the troubleshooting procedures on the PXE Boot Loader webpage as required 8 Use the troubleshooting procedures on the Intel i210 PROSet Drivers webpage as required 9 Verify that t...
Страница 13: ...con Tray indication __________________________________________________________________________ Connected Device s _____________________________________________________________________________ 3 Provid...
Страница 14: ...operation of Nuclear Facilities Aircraft Navigation or Aircraft Communication Systems Air Traffic Control Life Support or Weapons Systems High Risk Activities Transition Networks and its supplier s s...