Transition Networks MIL-SM2401MAF
24-Hour Technical Support: 1-800-260-1312 International: 00-1-952-941-7600
11
2. Remove adhesive backing from the Rubber Pads.
3. Apply the Rubber Pads to each corner on the bottom of the switch. These
footpads can prevent the switch from shock/vibration.
Rack-mounted Installation
The switch come with a rack-mounted kit and can be mounted in an EIA standard size,
19-inch Rack. The switch can be placed in a wiring closet with other equipment.
Perform the following steps to rack mount the switch:
1. Position one bracket to align with the holes on one side of the switch and secure it
with the smaller bracket screws. Then attach the remaining bracket to the other
side of the switch.
2. After attaching both mounting brackets, position the 24 10/100TX plus 2
Mini-GBIC/Copper managed PoE switch in the rack by lining up the holes in the
brackets with the appropriate holes on the rack. Secure the switch to the rack with
a screwdriver and the rack-mounting screws.
[Note]
For proper ventilation, allow about at least 4 inches (10 cm) of clearance on
the front and 3.4 inches (8 cm) on the back of the switch. This is especially
important for enclosed rack installation.
Power On
Connect the power cord to the power socket on the rear panel of the switch. The other
side of power cord connects to the power outlet. The internal power supply of the
Switch works with AC voltage range of 100-240V and Frequency of 50~60Hz. Check
the power indicator on the front panel to see if power is properly supplied.