4-3
Chapter 4
Installing the IT2200 Reader System
This chapter includes information on:
Assessing the Site — Instructions for conducting an RF survey of the
chosen site and formulating a frequency plan.
Preparing the Site — Checklist of tasks involved in preparing a site for
installation.
Installing the System — Checklist of required components and a
checklist of installation tasks. Description of where to mount the reader
system components for several typical site configurations. Step-by-step
instructions for installing the system.
Assessing the Site and Formulating a Frequency Plan
Perform an RF site survey to check for RF noise sources near the toll plaza or toll lane
being installed. Use a spectrum analyzer and a horizontally polarized whip antenna.
(TransCore recommends a Agilent Technologies Model 8523 spectrum analyzer.)
•
Set up the test equipment under the plaza canopy, if possible, or within a 15m (50-
ft) radius of the plaza.
•
Record any frequencies operating in the 902 to 904 MHz or the 909.75 to 921.75
MHz bands.
•
If you find frequencies within these bands, check the power level. Power levels
exceeding -10dBm could possibly alter the consideration of installing the system
at this site or the frequency plan for the system. Consult with Amtech
®
if you
encounter this problem.
Formulate a frequency plan for the plaza. There are two frequencies for each reader:
downlink (reader-to-tag communication) and uplink (tag-to-reader response). For this
system, all readers share the same downlink frequency, which is generally set to
918.75 MHz. Uplink frequencies should alternate between adjacent lanes. For exam-
ple, a four-lane plaza would have the frequencies shown in Table 4-1.
Содержание Amtech IT2200
Страница 1: ...IT2200ReaderSystem P N 411554 Installation Maintenance Service Guide withMultimodeCapability...
Страница 2: ......
Страница 5: ......
Страница 6: ......
Страница 7: ...Contents...
Страница 8: ......
Страница 19: ...1 Before You Begin...
Страница 20: ......
Страница 25: ...2 Theory of Operation...
Страница 26: ......
Страница 41: ...3 System Components...
Страница 42: ......
Страница 67: ...4 Installing the IT2200 Reader System...
Страница 68: ......
Страница 91: ...5 Tuning the Lane...
Страница 92: ......
Страница 109: ...6 Troubleshooting the Installation...
Страница 110: ......
Страница 129: ...7 Preventive Maintenance...
Страница 130: ......
Страница 133: ...A Acronyms and Glossary...
Страница 134: ......
Страница 142: ...IT2200 Reader System with Multimode Capability Installation Maintenance Service Guide A 10...
Страница 143: ...B Block Diagrams...
Страница 144: ......
Страница 147: ...Block Diagrams B 5 IT2020 Reader Logic Card Figure B 3 IT2020 Reader Logic Card Functional Block Diagram...
Страница 149: ...Block Diagrams B 7 Figure B 5 Minimum Connections for the IT2020 Reader Logic Card Interface Bistatic Application...
Страница 151: ...Block Diagrams B 9 IT2611 RF Module Figure B 7 IT2611 RF Module Functional Block Diagram Bistatic Configuration...
Страница 153: ...C System Technical Specifications...
Страница 154: ......
Страница 160: ...IT2200 Reader System with Multimode Capability Installation Maintenance Service Guide C 8...
Страница 161: ...D Hardware Interfaces...
Страница 162: ......
Страница 185: ...E Connector Pin outs...
Страница 186: ......
Страница 204: ...IT2200 Reader System with Multimode Capability Installation Maintenance Service Guide E 20...