Start Up
40
RT-SVX26K-EN
Final System Set Up
After completing all of the pre-start and start-up
procedures outlined in the previous sections (i.e.,
operating the unit in each of its modes through all
available stages of cooling and heating), perform these
final checks before leaving the unit:
•
Program the Night Setback (NSB) panel (if applicable)
for proper unoccupied operation. Refer to the
programming instructions for the specific panel.
•
Verify that the Remote panel “System” selection
switch, “Fan” selection switch, and “Zone
Temperature” settings for automatic operation are
correct.
•
Inspect the unit for misplaced tools, hardware, and
debris.
•
Verify that all exterior panels including the control
panel doors and condenser grilles are secured in place.
•
Close the main disconnect switch or circuit protector
switch that provides the supply power to the unit’s
terminal block or the unit mounted disconnect switch.
Figure 32.
RTAM module
Static
pressure
setpoint
Static
pressure
deadband For remote deadband cut
this jumper
Reset
setpoint
Supply Air Heating
Setpoint
R66
Reset
amount
Supply air
cooling
setpoint
Morning
warmup
setpoint
R63
R68
R69
R67
R64
1 2 3 4 5 6 7 8 9 10 11 12
Remote setpoint
terminal strip
12345
SW1
Supply Air (Static) Pressure S.P.
DIP switch
1
IGU Config
R
e
set Select
D
W
U Enable
VAV w/o IGV
IGV - OFF OFF
VFD - ON OFF
1
2
No Reset OFF OFF
Return Air OFF ON
Zone Temp ON OFF
Outdoor Air ON ON
3
4
5
DWU Disable OFF
DWU Enable ON
ON
Supply Air Cooling Setpoint
Supply Air Reset Amount
Supply Air (Static) Pressure Deadband
Morning Warmup Setpoint
Supply Air Reset Setpoint
OFF ON
ON ON
2
3
4
5
SW1
R 75
13 14
Supply Air Heating Setpoint