Creating an Entry for Cables

Cables are connected from the bottom of the pedestal, through a metal gland plate, and into the cabinet. The gland plates must
be fitted to the unit to ensure the specified degree of protection.

1.

Open the mains cabinet and remove the nuts from the mains gland plate.

2.

Remove the mains gland plate.

3.

Open the motor cabinet and remove the nuts from the motor gland plate.

4.

Remove the motor gland plate.

5.

Use a sheet metal punch to create entry holes in the mains and motor plates. Refer to the gland plate dimensions in the
operating instructions.

Attaching the Unit to the Pedestal

WARNING

Heavy Object!

Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment
or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or
slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables
(chains or slings) may not be of the same length. Adjust as necessary for even unit lift.

NOTICE

Equipment Damage!

Failure to follow instructions below could result in equipment damage.
Do not carry or lift the unit by the discharge plate. Use only the hangar brackets located at each corner to carry or lift the unit.

1.

Lift the frequency converter and position it on the pedestal.

2.

Verify that there is 225 mm (9 in) top clearance for air exhaust.

3.

Verify that the air intake at the bottom front of the unit is not obstructed.

4.

Install an M8x60 mm bolt with lock washer and flat washer through the frame and into the threaded hole at each corner
of the base. To ensure correct IP21/IP54 enclosure protection, the M8x60 bolts must go through the frame. Install 4 bolts
per cabinet. Torque to 9.6 Nm (85 in-lb). See 

Illustration 1.1

.

5.

Install an M10x30 mm bolt with captive lock washer and flat washer through each corner of the base plate and into the
threaded hole in the base. Install 4 bolts per cabinet. Torque to 19 Nm (169 in-lb). See 

Illustration 1.1

.

6.

Reattach the mains and motor gland plates as shown in 

Illustration 1.2

.

Installation Instructions

Pedestal Kit for F-size Enclosures
TR200 Series

2

 All rights reserved.

BAS-SVN021

B

-EN

Содержание TR200 Series

Страница 1: ...rting up and servicing of heating ventilating and air conditioning equipment can be hazardous and requires specific knowledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the literature and on the tags stickers and labels that are attached to the equipment ...

Страница 2: ... appropriate voltmeter that all capacitors have discharged For additional information regarding the safe discharge of capacitors see PROD SVB06AEN The frequency converter contains DC link capacitors which can remain charged even when the frequency converter is not powered High voltage can be present even when the warning indicator lights are off Failure to wait for a minimum of 40 minutes after po...

Страница 3: ...ables chains or slings may not be of the same length Adjust as necessary for even unit lift NOTICE Equipment Damage Failure to follow instructions below could result in equipment damage Do not carry or lift the unit by the discharge plate Use only the hangar brackets located at each corner to carry or lift the unit 1 Lift the frequency converter and position it on the pedestal 2 Verify that there ...

Страница 4: ...lt with lock washer and flat washer 2 M10x30 mm bolt with captive lock washer and flat washer Figure 2 Attaching the Gland Plates Illustration 1 2 Attaching the Gland Plates 1 Motor cables 2 Motor gland plate 3 Mains gland plate 4 Mains cables Installation Instructions Pedestal Kit for F size Enclosures TR200 Series BAS SVN021B EN All rights reserved 3 ...

Страница 5: ...Installation Instructions Pedestal Kit for F size Enclosures TR200 Series All rights reserved BAS SVN021B EN ...

Страница 6: ... to using environmentally conscious print practices Trane by Trane Technologies NYSE TT a global climate innovator creates comfortable energy efficient indoor environments for commercial and residential applications For more information please visit trane com or tranetechnologies com BAS SVN021B EN 18 Aug 2020 Supersedes BAS SVN021A EN Jun 2016 130R0682 M0025401 130R0682 ...

Отзывы: