36
TK 56321-18-IM-EN
Completing the Installation
IIm
mp
po
orrtta
an
ntt:: BEFORE COMPLETING THE INSTALLATION, YOU MUST PERFORM THE FOLLOWING PROCEDURES IN
ACCORDANCE WITH THE THERMO KING INSTALLATION STANDARDS AND PROCEDURES GUIDE (TK
56430):
•
SYSTEM EVACUATION PROCEDURES
•
SYSTEM LEAK CHECK PROCEDURES
•
SYSTEM CHARGING PROCEDURES
•
CONFIGURATION SOFTWARE PROCEDURES
•
CONTROLLER PARAMETER SETUP