74
TK 55676-19-IM-EN
Arctic Switch (Option)
Installation Procedures
C
CA
AU
UT
TIIO
ON
N
R
Riisskk o
off IIn
njju
urry
y!!
A
Allw
wa
ay
yss w
we
ea
arr ssa
affe
etty
y g
go
og
gg
glle
ess a
an
nd
d w
wo
orrkk g
gllo
ov
ve
ess w
wh
he
en
n w
wo
orrkkiin
ng
g w
wiitth
h a
an
nttiiffrre
ee
ezze
e.. T
Th
he
e A
AP
PU
U a
an
nd
d ttrra
acctto
orr’’ss e
en
ng
giin
ne
e
cco
oo
olla
an
ntt ssy
ysstte
em
m ssh
ho
ou
ulld
d b
be
e a
att a
am
mb
biie
en
ntt tte
em
mp
pe
erra
attu
urre
e tto
o p
prre
ev
ve
en
ntt h
ho
ott,, p
prre
essssu
urriizze
ed
d cco
oo
olla
an
ntt ffrro
om
m cca
au
ussiin
ng
g p
pa
aiin
nffu
ull
b
bu
urrn
nss tto
o e
ex
xp
po
osse
ed
d sskkiin
n a
an
nd
d e
ey
ye
ess..
C
CA
AU
UT
TIIO
ON
N
R
Riisskk o
off IIn
njju
urry
y!!
T
To
o p
prre
ev
ve
en
ntt tth
he
e A
AP
PU
U ffrro
om
m sstta
arrttiin
ng
g u
un
ne
ex
xp
pe
ecctte
ed
dlly
y,, sse
ett a
allll e
elle
eccttrriicca
all cco
on
nttrro
ollss tto
o tth
he
e O
OF
FF
F p
po
ossiittiio
on
n B
BE
EF
FO
OR
RE
E
cco
on
nn
ne
eccttiin
ng
g w
wiirre
ess tto
o b
ba
atttte
erry
y..
1. Locate Arctic Option harness ((W
WT
T2
2,,W
WT
T2
2--R
RT
TN
N)) band wrapped inside unit, near top, right side of frame. Un-band and
route harness and connector out of unit, through hole in right side of frame, behind pre-cooler coil. Secure
connector to anchor provided on outside of panel as shown in illustration.
2. Locate IIN
NL
LE
ET
T coolant hose and measure approximately 6.00 in. (152.4 mm) out from APU.
3. Slide sleeving away to expose coolant hose and mark 3.00 in. (76.2 mm) to be removed.
4. Clamp off each side of coolant hose with a hose crimper to prevent excessive coolant loss.
5. Use a hose cutter and remove 3.00 in. (76.2 mm) section of coolant hose.
6. Install tube and sensor assembly with hose clamps.
IIm
mp
po
orrtta
an
ntt:: When tube and sensor assembly is installed horizontally sensor must face down, when installed vertically
sensor must face towards APU ((D
DE
ET
TA
AIIL
L A
A)).
7. Plug sensor harness to mating 2-pin connector ((W
WT
T2
2,, W
WT
T2
2--R
RT
TN
N)) located outside APU.
8. Provide a drip loop and secure all wires adequately with supplied band wraps.
9. Operate unit, check for leaks and reinstall sleeving on coolant hose.