34
TK 56701-1-IM-EN
Installing Condensing Unit
Unit Mounting Bolt Requirements
N
NO
OT
TIIC
CE
E
E
Eq
qu
uiip
pm
me
en
ntt D
Da
am
ma
ag
ge
e!!
A
Allll m
mo
ou
un
nttiin
ng
g b
bo
ollttss m
mu
usstt b
be
e tth
he
e cco
orrrre
ecctt lle
en
ng
gtth
h ffo
orr tth
he
eiirr a
ap
pp
plliicca
attiio
on
nss a
an
nd
d tto
orrq
qu
ue
ed
d tto
o ssp
pe
ecciiffiicca
attiio
on
n.. IIn
ncco
orrrre
ecctt b
bo
olltt
lle
en
ng
gtth
hss a
an
nd
d iim
mp
prro
op
pe
err tto
orrq
qu
ue
e ssp
pe
ecciiffiicca
attiio
on
nss cca
an
n d
da
am
ma
ag
ge
e e
eq
qu
uiip
pm
me
en
ntt..
Unit mounting bolts are installer supplied and must meet the following requirements:
Bolt Size and Thread Pitch
1/2–13 UNC, Full Thread
Grade
SAE Grade 5 (ISO 8.8)
Finish
Zinc Dichromate, Cadmium Plated.
Length
The length of each of the four mounting bolts protruding from the front wall of the cargo box is
shown in the illustration.
•
Three bolts are the same length.
•
One bolt is longer.
•
After unit is installed, a minimum of 2 thread pitches must extend beyond the surface of the nut.
Torque Specifications
81.4 N•m (60 ft-lb.)
Important:
Apply blue thread locker to all four (4) unit mounting bolts during unit installation.
Figure 19.
Confirm a minimum of 2 thread pitches extend beyond the surface of the nut.