70
TK 56701-1-IM-EN
Three Zone Installations
IIm
mp
po
orrtta
an
ntt:: Safety precautions must be followed. Refer to U
Un
niitt IIn
nsstta
alllla
attiio
on
n H
Ha
azza
arrd
dss located in the S
Sa
affe
etty
y P
Prre
ecca
au
uttiio
on
nss
section of this manual before proceeding.
Connections at Condensing Unit
Refer to the illustrations on the following pages.
The following installation standards must be followed:
•
Thermo King requires the use of bulk rolled refrigeration tubing and tube benders to reduce fittings and solder
joints where applicable . It is also required that the use of nitrogen or another inert gas be used to purge the tubes
before soldering. This prevents oxidation and formation of scale inside tubes.
•
Clean all tubes and fittings prior to installation and soldering.
•
Discard O-rings that come with the condensing unit. Oil and install new O-rings supplied in kit.
•
Clean all threads on ORS fittings prior to installation.
•
Apply refrigerant oil to the O-rings only. D
DO
O N
NO
OT
T A
AP
PP
PL
LY
Y O
OIIL
L T
TO
O T
TH
HE
E O
OR
RS
S F
FIIT
TT
TIIN
NG
G T
TH
HR
RE
EA
AD
DS
S!!
•
Each zone needs to have a separate suction line with a check valve installed as close as possible to condensing unit.
N
No
otte
e:: Remove internal components of valves before soldering and use 35% silver solder.
•
When tightening ORS tubing connections, always use a backup wrench to hold the backside of the ORS fitting to
prevent the refrigeration tube from twisting.
•
Torque ORS fittings on the condenser as shown in the table below.
•
Insulation should be added to all segments of suction and hot gas tubes.
•
Secure all tubing every 609.6 mm (24.00 in.) with provided clamps.
Specifications for ORS Fittings
Tube
Size
Thread
Torque
O-Ring Gaskets
P/N
Liquid
3/8 in.
11/16–16
16–17 ft-lb
331015
Hot Gas
1/2 in.
13/16–16
32–35 ft-lb
330566
Suction
1–1/8 in.
1–11/16–12
93–102 ft-lb
331777