Pre-Startup
Before starting up units, perform the following
procedure to ensure proper unit operation.
Pre-Startup Checklist
Complete this checklist after installing unit to verify all
recommended installation procedures are complete
before startup. This does not replace the detailed
instructions in the appropriate sections of this manual.
Always read the entire section carefully to become
familiar with the procedures.
Supply Fan
Ensure the fan rotates freely.
Ductwork
•
Ensure trunk ductwork to VAV boxes is complete
and secure to prevent leaks.
•
Verify that all ductwork conforms to NFPA 90A or
90B and all applicable local codes.
Water-Cooled Unit Piping
Verify condensate drain, water piping drain plugs,
economizer header, strainer pressure transducers, and
condenser vent plug are installed.
Units with Hydronic Heat
Verify the entering water temperature sensor is
installed upstream of the hydronic coil.
Electrical
Verify electrical connections are tight.
Components
•
Verify liquid line service valve, and suction and
discharge service valves if present, are open at
startup.
N
No
otte
e:: Each compressor suction line contains a low
pressure sensor that will shut the
compressor down in low pressure situations.
See
•
Ensure system components are properly set and
installed.