4
System
□
Systems can be operated under all design selection points to verify proper operation.
Note:
Additional time required to properly complete the start-up and commissioning, due to any
incompleteness of the installation, will be invoiced at prevailing rates.
This is to certify that the Trane equipment has been properly and completely installed, and that the
applicable items listed above have been satisfactorily completed.
Checklist Completed by
(Print Name):
SIGNATURE:
DATE:
In accordance with your quotation and our purchase order number, we therefore
require the
presence of Trane service on this site, for the purpose of start-up and commissioning, by
______________ (date).
Note:
Minimum of two week advance notification is required to allow for scheduling of unit start-up.
ADDITIONAL COMMENTS/INSTRUCTIONS
Note:
A copy of this completed form must be submitted to the Trane Service Agency that will be
responsible for start-up of equipment.