Installation
General Information
(single circuit), and RAUP 400, RAUP 500
,
RAUP
600 (dual circuilts)
air cooled condensing units. Installation
procedures should
be performed in the sequence that they appear
in this manual. Do
not
destroy or remove the manual from the
unit. The manual should
should
remain weather-protected with the unit
until all installation
procedures
are complete.
Note: It is not the intention of this manual to cover all possible
variations in the systems that may occur or to provide
comprehensive information concerning every possible contingency
that may be encountered during an installation. If additional
information is required or if specific problems arise that are not
fully discussed in this manual, contact your local sales office.
Note: “Warnings” and “Cautions” appear at appropriate places in
this manual. Your personal safety and the proper operation of this
machine require that you follow them carefully. The Company
assumes on liability for installations or servicing performed by
unqualified personnel.
Unit nameplate
The unit nameplate gives the full model reference. The power
supply of the unit is specified and must not vary by more that 5%
of the specified voltage.
Machine room installation requirements
Foundation
A special base or foundation is not required when the floor is
level and of sufficient strength to support the unit's weight.
Lifting of the unit
Four lifting lugs are provided at the base of each unit for crane
lift. Attach cable slings to each lug (refer to Figure1) and install
a spreader bar between the cable to protect the unit. Make sure
that the lifting equipment is capable of handling the weight of the
unit.(Table 1)
Clearances
Provide sufficient clearance around the unit for performance of
service and maintenance. Caution unit operation is a function of
the air temperature. Any recycling of the air fed out by the fans
will increase the air intake temperature over the condense fins
and result in a high temperature out. Make sure nothing prevents
air flow to run through the unit coils. Refer to dimensional drawing
recommended for detailed clearances, under “Dimensional Data”
section.
Special lifting and moving instruction
A specific lifting method is recommended as follows:
1. Four lifting points are built into the unit
2. Slings and spreader bar to be provided by rigger and attached
to the four lifting points.
3. Minimum rated lifting capacity (vertical) of each sling and
spreader bar shall be no less than the tabulated unit shipping
weight.
4. Caution :The unit must be lifted with the utmost care Avoid
shock load by lifting slowly and evenly.
Figure 1
Lifting of the unit
Vibration Isolators (option)
Vibration isolators (rubber pads) are recommended and are to be
placed under the unit feet. The unit is levelled by placing the
3
This manual cover the installation of the RAUP 250
, RAUP 300