5
RAU-SVX01G-GB
Installation
For minimum clearance, consult the certifi ed submittals, which are available on request from your Trane Sales Offi ce.
Unit nameplate
The unit nameplate gives the complete model reference numbers. The unit power rating is shown, and power
supplies should not deviate by more than 5 % from the rated power.
Compressor motor amperage is shown in box I.MAX.
The customer’s electrical installation must be able to withstand this current.
Installation instructions
Foundations
No special foundations are required, provided the supporting surface is fl at and level, and can withstand the weight
or the unit.
Anti-vibration rubber pads
They are supplied as standard with the machine, and should be placed between the supporting fl oor and the unit to
attenuate vibrations.
– 4 pads for the sizes 190 to 300
– 6 pads for the sizes 350 to 800
– Trane does not allow the installation of spring isolators.
Clearance
Respect recommended clearance around the unit to allow maintenance operation to take place without obstruction
and recommended clearance around condenser.
CAUTION!
Unit operation depends on the air temperature. Any recycling of the air fed out by the fans will increase
the air intake temperature over the condenser fi ns and can result in high pressure cut-out.
In this case the standard operating conditions are modifi ed.
Operation of the unit may be affected by an increase in air temperature on the condenser.
When the units are positioned in a windy area, avoid all the risks of air-cooled recycling.
See submittals
Handling
Note:
The plates welded at the end of the bases must not be used for handling.
Figure 1 –
Handling
A
B
Содержание RAUL 190
Страница 22: ...22 RAU SVX01G GB Notes ...
Страница 23: ...23 RAU SVX01G GB Notes ...