background image

14

RAU-SVX01B-E4

Maintenance

Maintenance Instructions

The following maintenance
instructions are part of maintenance
operations required for this
equipment. A qualified technician is
needed for regular maintenance as
part of a regular maintenance
contract.
Carry out all operations as required
by schedule. This will insure long
unit service life and reduce the
possibility of serious and costly
breakdown.
Keep service records up to date,
showing monthly information on
unit operations.
These records can be of great help
to maintenance personnel
diagnostics. Similarly, if machine
operator keeps a log of changes in
unit operating conditions, problems
can be identified and solutions found
before more serious problems arise.

Inspection visit after the first 500
hours of operation from unit start up

- Carry out oil analysis.
- Carry out leak test.
- Inspect contacts and tighten

terminals.

- Record operating pressures,

temperatures, amperages and
voltage.

- Check operation of

machines/compare conditions of
operation against original
commissioning data.

- Fill out inspection visit log sheet

and review with the operator.

Monthly preventive visit

- Carry out leak test.
- Oil test of acidity.
- Inspect contacts and tighten

terminals.

- Record operating pressures,

temperatures, amperages and
voltage.

- Check operation of machines/

compare conditions of operation
against original commissioning
data.

- Fill out visit log sheet and review

with the operator.

Annual preventive visit 

- Check operational set points and

performance.

- Calibrate controls.
- Check operation of all safety

devices.

- Inspect contacts & tighten

terminals.

- Megger the motor compressor

windings.

- Record operating pressures,

temperatures, amperages and
voltage.

- Carry out leak test.
- Check configuration of unit control

module.

- Carry out oil analysis
- Change the oil as required based

upon results of the oil analysis

- Check operation of

machines/compare conditions of
operation against original
commissioning data.

- Fill out the annual start up visit log

sheet and review with the
operator.

Caution

- Please refer to specific Trane

documentation on oil, available
from your nearest Trane office.
Oils recommended by Trane have
been exhaustively tested in Trane
laboratories to the specific
requirement of Trane chiller and
hence the user’s requirements.
Any use of oils not meeting
specifications recommended by
Trane is the responsibility of the
user only, who thereby is liable to
warranty loss.

- Oil analysis and oil test acidity

must be carried out by a qualified
technician. Poor interpretation of
results may cause unit operating
problems. Also, oil analysis must
follow the correct procedures, to
avoid accidental injury to
maintenance personnel.

- If the condensers are dirty, clean

them with a brush. If the coils are
too dirty, consult a cleaning
professional. Never use water to
clean condenser coils. 

- Contact Trane  ServiceFirst  for

information on maintenance
contracts.

Warning

- Switch off unit main power supply

before to any intervention. Failure
to follow this safety instruction can
lead to accident death of the
maintenance personnel and may
also destroy equipment.

- Never use steam or hot water

above 55°C to clean condenser
coils. The resulting increasing
pressure could cause refrigerant
loss through the safety valve.

Содержание RAU-SVX01B-E4

Страница 1: ...Installation Operation Maintenance RAU Air Cooled Condensing Unit Sizes 190 260 300 350 400 450 500 600 700 800 RAU SVX01B E4 To be used with the manual of SMM module Reference L80 IM 022 E...

Страница 2: ...st to the last carrier of the goods within 72 hours of delivery Notify the local Sales Office at the same time The unit should be totally inspected within 7 days of delivery If any concealed damage is...

Страница 3: ...acteristics 7 Electrical connections 10 General start up Preparation 11 Start up 11 Operation Control and unit operation 13 Seasonal shutdown and start up 13 Weekly start up and week end shutdown 13 M...

Страница 4: ...does not allow to install spring isolators Clearance Respect recommended clearance around the unit to allow maintenance operation to take place without obstruction and recommended clearance around co...

Страница 5: ...ing itself to avoid transmission to building structure of vibrations normally caused by pipework Also avoid bypassing the unit s damping system by fixing the refrigerant lines or the electrical ducts...

Страница 6: ...alist who has performed this start up The quantiy of refrigerant and oil added are at the client s charges Refrigerant charge all split system types After system pressure and vacuum testing fill up un...

Страница 7: ...e size mm 9 52 9 52 9 52 9 52 9 52 9 52 9 52 9 52 9 52 9 52 Tube type Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Height mm 1219 1219 1219 1219 1219 1219 1219 1219 1219 1219...

Страница 8: ...ate Fin Tube size mm 9 52 9 52 9 52 9 52 9 52 9 52 9 52 9 52 9 52 9 52 Tube type Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Height mm 1219 1219 1219 1219 1219 1219 1219 1219...

Страница 9: ...9 52 9 52 9 52 9 52 9 52 9 52 9 52 9 52 9 52 Tube type Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Smooth Height mm 1219 1219 1219 1219 1219 1219 1219 1219 1219 1219 Length mm 2743...

Страница 10: ...s the transformer If the transformer is not ordered it is necessary to foresee the power supply of the electronic module separately Warranty reserves will be formulated if a transformer not supplied b...

Страница 11: ...ing the isolators located under the rails supporting the compressor Put the plexiglass supplied by Trane in front of the power terminal Ensure all refrigerant valves are in service positions Ensure th...

Страница 12: ...C With 407c it should be 20 to 23 C Final check When the unit is operating correctly Check that the unit is clean and clear of any debris tools etc All valves are in operating position Close control...

Страница 13: ...g pressures temperatures amperages and voltage Check operation of machines compare conditions of operation against original commissioning data Push button O of the module Insure that all safeties are...

Страница 14: ...ck operation of all safety devices Inspect contacts tighten terminals Megger the motor compressor windings Record operating pressures temperatures amperages and voltage Carry out leak test Check confi...

Страница 15: ...dryer and sight glass presence Check oil traps presence on discharge line if there vertical risers 3m Check pitch for horizontal lines 1cm m Check refrigerant presence Electrical equipment Check direc...

Страница 16: ...circuit open Compressor sticking damaged or sticking components Discharge pressure too high Discharge pressure too high a Voltage too low b Cooling demand too high or condensing temperature too high N...

Страница 17: ...neven liquid flow b Expansion valve locked in open position Not enough refrigerant Drier filter clogged Superheat not properly adjusted Presence of uncondensable liquids in system or excess refrigeran...

Страница 18: ...too low Excessive pressure drop through filter drier Refrigerant does not flow through thermostatic expansion valve Loss of power Superheat too low Excess cooling demand on evaporator a Expansion valv...

Страница 19: ...15 8 4 1 17 3 4 1 4 C 16 2 4 4 18 2 4 4 20 4 4 4 22 8 4 4 13 0 4 4 14 1 4 4 15 4 4 4 16 8 4 4 2 C 16 6 4 7 18 6 4 7 20 8 4 7 23 2 4 7 12 8 4 7 13 9 4 7 15 1 4 7 16 5 4 7 18 0 4 7 0 C 17 0 5 0 19 0 5...

Страница 20: ...3 6 8 29 1 6 8 19 3 6 8 21 4 6 8 23 8 6 8 26 3 6 8 29 0 6 8 Saturated suction temperature Table 5 RAU 700 R22 RAU 800 R22 Outdoor AmbientTemperature C 25 C 30 C 35 C 40 C 45 C 25 C 30 C 35 C 40 C 45...

Страница 21: ...1 2 2 6 C 10 1 2 3 10 9 2 3 11 9 2 3 13 4 2 3 15 1 2 3 9 9 2 3 10 8 2 3 11 7 2 3 12 6 2 3 13 7 2 3 4 C 9 9 2 5 10 7 2 5 12 0 2 5 13 6 2 5 15 3 2 5 9 8 2 5 10 5 2 5 11 4 2 5 12 4 2 5 13 4 2 5 2 C 9 8 2...

Страница 22: ...12 3 4 2 13 9 4 2 15 6 4 2 17 4 4 2 10 9 4 2 12 3 4 2 13 8 4 2 15 5 4 2 17 3 4 2 Saturated suction temperature Table 10 RAU 700 R134a RAU 800 R134a Outdoor AmbientTemperature C 25 C 30 C 35 C 40 C 45...

Страница 23: ...7 1 9 22 9 29 6 4 4 1 3 7 6 19 0 48 2 43 2 44 0 85 5 83 0 2 0 21 7 28 4 4 5 0 6 7 0 20 0 50 3 45 4 45 0 86 6 84 2 2 1 20 5 27 2 4 6 0 0 6 3 21 0 52 3 47 5 46 0 87 6 85 4 2 2 19 4 26 1 4 7 0 6 5 7 22...

Страница 24: ...15 1 3 7 16 6 3 7 18 2 3 7 4 C 16 4 4 0 18 6 4 0 21 0 4 0 23 6 4 0 26 5 4 0 12 3 4 0 13 4 4 0 14 7 4 0 16 1 4 0 17 7 4 0 2 C 16 8 4 3 19 0 4 3 21 4 4 3 24 0 4 3 27 0 4 3 12 1 4 3 13 2 4 3 14 4 4 3 15...

Страница 25: ...6 6 4 30 6 6 4 19 7 6 4 22 0 6 4 24 6 6 4 27 4 6 4 30 4 6 4 DewTemperature At Evaporating Pressure Table 16 RAU 700 R407C RAU 800 R407C Outdoor AmbientTemperature C 25 C 30 C 35 C 40 C 45 C 25 C 30 C...

Страница 26: ...control validation B08 Auxiliary set point validation B09 Current date display B091 Day B092 Month B093 Year B10 Current time display B101 Hours B102 Minutes B103 Seconds B11 Set this parameter to 0...

Страница 27: ...27 RAU SVX01B E4 Notes...

Страница 28: ...aximum operating life of your equipment We would remind you that failure to respect these installation and maintenance instructions may result in immediate cancellation of the warranty Training The eq...

Отзывы: