T_C-IOM-2A
18
Installation
Horizontal Discharge Conversion
TSC060
If a unit is to be converted to Horizontal discharge, the follow-
ing conversion must be performed:
1. Remove the return and supply duct covers.
2. Apply gasket to the supply duct cover as shown.
3. Position duct covers as shown below. Rotate supply duct
cover 90 degrees to allow it to be slid into supply opening.
Note: If unit is equipped with Discharge Air Sensing
option refer to the following figure for proper tube
positioning based on unit tonnage.
4. Slide duct covers into duct openings until endward edge of
the duct cover engages with the 2 retaining clips on the duct
flanges. Secure the outward edge of the each duct cover
with 2 screws.
Note:
Certain unit/electric heater combinations require a limit switch
change out for horizontal airflow applications. Refer to the
following instructions to determine if this process is required
for the unit undergoing installation.
5. After completing installation of the duct covers for horizontal
discharge,proceed to TCO-A instructions.
Содержание Precedent TSC060
Страница 25: ...25 T_C IOM 2A Installation Figure 6 Typical Field Wiring Diagrams for Optional Controls ReliaTel only...
Страница 42: ...T_C IOM 2A 42...
Страница 43: ...43 T_C IOM 2A...