Installation
ACC-SVN199E-EN
7
6. Build top block off assembly as shown in
a. Apply gasket 7 to the bottom of 12.
b. Apply 11 to prevent insulation from coming off.
7. Using six screws secure the internal hood assembly
to side flanges of return opening. See
.
8. Apply gasket 14 to return opening around the dimples
as shown in
.
Figure 4.
Bottom gasket installation
Figure 5.
Build top block-off assembly
0.78(2X)
11
Gasket (7)
12
Figure 6.
Attach internal hood assembly to unit
Figure 7.
Apply gasket
Screws
Gasket
Dimples
Содержание Power Exhaust Foundation BAYPWRX320
Страница 15: ...Notes ACC SVN199E EN 15...