34
18-GE20D1-1E-EN
Checkout Procedures
The final phase of the installation is the system Checkout Procedures. The following list represents the most common items covered in a
Checkout Procedure. Confirm all requirements in this document have been met.
☐
All wiring connections are tight and properly secured.
☐
Voltage and running current are within limits.
☐
Ductwork is sealed and insulated.
☐
Supply registers and return grilles are open, unobstructed, and air
filter is installed.
☐
Indoor blower and outdoor fan are operating smoothly and
without obstruction.
☐
Indoor blower motor set on correct speed setting to deliver
required CFM. “Blower and fan set screws are tight.”
☐
Cover panels are in place and properly tightened.
☐
System functions safely and properly in all modes.
☐
Owner has been instructed on use of system and given manual.
Содержание P0V0 Series
Страница 9: ...18 GE20D1 1E EN 9 Outline Drawings Table 3 14 5 Width Cabinet ...
Страница 10: ...10 18 GE20D1 1E EN Table 4 17 5 Width Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 11: ...18 GE20D1 1E EN 11 Table 5 21 Width Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 12: ...12 18 GE20D1 1E EN Table 6 24 5 Width Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Страница 35: ...18 GE20D1 1E EN 35 N No ot te es s ...