background image

©2021

18-GE20D1-1E-EN

SAFETY SECTION
MODULAR BLOWERS

IIm

mp

po

orrtta

an

ntt:: This document contains a wiring diagram,

a parts list, and service information. This is
customer property and is to remain with
this unit. Please return to service
information pack upon completion of work.

IIm

mp

po

orrtta

an

ntt:: These instructions do not cover all

variations in systems nor provide for every
possible contingency to be met in
connection with the installation. Should
further information be desired or should
particular problems arise which are not
covered sufficiently for the purchaser’s
purposes, the matter should be referred to
your installing dealer or local distributor.

W

WA

AR

RN

NIIN

NG

G

H

HA

AZ

ZA

AR

RD

DO

OU

US

S V

VO

OL

LT

TA

AG

GE

E!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss W

Wa

arrn

niin

ng

g cco

ou

ulld

d rre

essu

ulltt iin

n

p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e,, sse

ev

ve

erre

e p

pe

errsso

on

na

all iin

njju

urry

y,, o

orr

d

de

ea

atth

h..

D

Diisscco

on

nn

ne

ecctt a

allll e

elle

eccttrriicc p

po

ow

we

err,, iin

nccllu

ud

diin

ng

g rre

em

mo

otte

e

d

diisscco

on

nn

ne

eccttss b

be

effo

orre

e sse

errv

viicciin

ng

g.. F

Fo

ollllo

ow

w p

prro

op

pe

err

llo

occkko

ou

utt//tta

ag

go

ou

utt p

prro

occe

ed

du

urre

ess tto

o e

en

nssu

urre

e tth

he

e p

po

ow

we

err

cca

an

nn

no

ott b

be

e iin

na

ad

dv

ve

errtte

en

nttlly

y e

en

ne

errg

giizze

ed

d..

C

CA

AU

UT

TIIO

ON

N

G

GR

RO

OU

UN

ND

DIIN

NG

G R

RE

EQ

QU

UIIR

RE

ED

D!!

F

Fa

aiillu

urre

e tto

o iin

nssp

pe

ecctt o

orr u

usse

e p

prro

op

pe

err sse

errv

viicce

e tto

oo

ollss m

ma

ay

y

rre

essu

ulltt iin

n e

eq

qu

uiip

pm

me

en

ntt d

da

am

ma

ag

ge

e o

orr p

pe

errsso

on

na

all iin

njju

urry

y..

R

Re

ecco

on

nn

ne

ecctt a

allll g

grro

ou

un

nd

diin

ng

g d

de

ev

viicce

ess.. A

Allll p

pa

arrttss o

off tth

hiiss

p

prro

od

du

ucctt tth

ha

att a

arre

e cca

ap

pa

ab

blle

e o

off cco

on

nd

du

uccttiin

ng

g e

elle

eccttrriicca

all

ccu

urrrre

en

ntt a

arre

e g

grro

ou

un

nd

de

ed

d.. IIff g

grro

ou

un

nd

diin

ng

g w

wiirre

ess,, ssccrre

ew

wss,,

ssttrra

ap

pss,, cclliip

pss,, n

nu

uttss,, o

orr w

wa

assh

he

errss u

usse

ed

d tto

o cco

om

mp

plle

ette

e a

a

p

pa

atth

h tto

o g

grro

ou

un

nd

d a

arre

e rre

em

mo

ov

ve

ed

d ffo

orr sse

errv

viicce

e,, tth

he

ey

y m

mu

usstt

b

be

e rre

ettu

urrn

ne

ed

d tto

o tth

he

eiirr o

orriig

giin

na

all p

po

ossiittiio

on

n a

an

nd

d p

prro

op

pe

errlly

y

ffa

asstte

en

ne

ed

d..

W

WA

AR

RN

NIIN

NG

G

L

LIIV

VE

E E

EL

LE

EC

CT

TR

RIIC

CA

AL

L C

CO

OM

MP

PO

ON

NE

EN

NT

TS

S!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss W

Wa

arrn

niin

ng

g cco

ou

ulld

d rre

essu

ulltt iin

n

p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e,, sse

ev

ve

erre

e p

pe

errsso

on

na

all iin

njju

urry

y,, o

orr

d

de

ea

atth

h..

F

Fo

ollllo

ow

w a

allll e

elle

eccttrriicca

all ssa

affe

etty

y p

prre

ecca

au

uttiio

on

nss w

wh

he

en

n

e

ex

xp

po

osse

ed

d tto

o lliiv

ve

e e

elle

eccttrriicca

all cco

om

mp

po

on

ne

en

nttss.. IItt m

ma

ay

y b

be

e

n

ne

ecce

essssa

arry

y tto

o w

wo

orrkk w

wiitth

h lliiv

ve

e e

elle

eccttrriicca

all cco

om

mp

po

on

ne

en

nttss

d

du

urriin

ng

g iin

nsstta

alllla

attiio

on

n,, tte

essttiin

ng

g,, sse

errv

viicciin

ng

g,, a

an

nd

d

ttrro

ou

ub

blle

essh

ho

oo

ottiin

ng

g o

off tth

hiiss p

prro

od

du

ucctt..

C

CA

AU

UT

TIIO

ON

N

IIM

MP

PR

RO

OP

PE

ER

R V

VO

OL

LT

TA

AG

GE

E C

CO

ON

NN

NE

EC

CT

TIIO

ON

N!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss C

Ca

au

uttiio

on

n cco

ou

ulld

d rre

essu

ulltt iin

n

p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e..

D

Do

o N

NO

OT

T cco

on

nn

ne

ecctt tth

he

e m

mo

od

du

ulla

arr b

bllo

ow

we

err lliin

ne

e v

vo

olltta

ag

ge

e

tto

o a

a G

GF

FC

CII p

prro

otte

ecctte

ed

d cciirrccu

uiitt..

C

CA

AU

UT

TIIO

ON

N

S

SH

HA

AR

RP

P E

ED

DG

GE

E H

HA

AZ

ZA

AR

RD

D!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss C

Ca

au

uttiio

on

n cco

ou

ulld

d rre

essu

ulltt iin

n

p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e o

orr p

pe

errsso

on

na

all iin

njju

urry

y..

B

Be

e cca

arre

effu

ull o

off ssh

ha

arrp

p e

ed

dg

ge

ess o

on

n e

eq

qu

uiip

pm

me

en

ntt o

orr a

an

ny

y

ccu

uttss m

ma

ad

de

e o

on

n ssh

he

ee

ett m

me

etta

all w

wh

hiille

e iin

nsstta

alllliin

ng

g o

orr

sse

errv

viicciin

ng

g..

C

CA

AU

UT

TIIO

ON

N

H

HA

AZ

ZA

AR

RD

DO

OU

US

S V

VA

AP

PO

OR

RS

S!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss cca

au

uttiio

on

n cco

ou

ulld

d rre

essu

ulltt iin

n

p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e o

orr p

pe

errsso

on

na

all iin

njju

urry

y..

E

Eq

qu

uiip

pm

me

en

ntt cco

orrrro

ossiio

on

n d

da

am

ma

ag

ge

e.. T

To

o p

prre

ev

ve

en

ntt

ssh

ho

orrtte

en

niin

ng

g iittss sse

errv

viicce

e lliiffe

e,, tth

he

e m

mo

od

du

ulla

arr b

bllo

ow

we

err

ssh

ho

ou

ulld

d n

no

ott b

be

e u

usse

ed

d d

du

urriin

ng

g tth

he

e ffiin

niissh

hiin

ng

g p

ph

ha

asse

ess o

off

cco

on

nssttrru

uccttiio

on

n o

orr rre

em

mo

od

de

elliin

ng

g.. T

Th

he

e llo

ow

w rre

ettu

urrn

n a

aiirr

tte

em

mp

pe

erra

attu

urre

ess cca

an

n lle

ea

ad

d tto

o tth

he

e ffo

orrm

ma

attiio

on

n o

off

cco

on

nd

de

en

nssa

atte

e.. C

Co

on

nd

de

en

nssa

atte

e iin

n tth

he

e p

prre

esse

en

ncce

e o

off

cch

hllo

orriid

de

ess a

an

nd

d ffllu

uo

orriid

de

ess ffrro

om

m p

pa

aiin

ntt,, v

va

arrn

niissh

h,, sstta

aiin

nss,,

a

ad

dh

he

essiiv

ve

ess,, cclle

ea

an

niin

ng

g cco

om

mp

po

ou

un

nd

dss,, a

an

nd

d cce

em

me

en

ntt

ccrre

ea

atte

ess a

a cco

orrrro

ossiiv

ve

e cco

on

nd

diittiio

on

n w

wh

hiicch

h m

ma

ay

y cca

au

usse

e

rra

ap

piid

d d

de

ette

erriio

orra

attiio

on

n o

off tth

he

e cca

ab

biin

ne

ett a

an

nd

d iin

ntte

errn

na

all

cco

om

mp

po

on

ne

en

nttss..

W

WA

AR

RN

NIIN

NG

G

S

SA

AF

FE

ET

TY

Y H

HA

AZ

ZA

AR

RD

D!!

T

Th

hiiss a

ap

pp

plliia

an

ncce

e iiss n

no

ott tto

o b

be

e u

usse

ed

d b

by

y p

pe

errsso

on

nss

((iin

nccllu

ud

diin

ng

g cch

hiilld

drre

en

n)) w

wiitth

h rre

ed

du

ucce

ed

d p

ph

hy

yssiicca

all,,

sse

en

nsso

orry

y,, o

orr m

me

en

ntta

all cca

ap

pa

ab

biilliittiie

ess,, o

orr lla

acckk o

off

e

ex

xp

pe

erriie

en

ncce

e a

an

nd

d kkn

no

ow

wlle

ed

dg

ge

e,, u

un

nlle

essss tth

he

ey

y h

ha

av

ve

e b

be

ee

en

n

g

giiv

ve

en

n ssu

up

pe

errv

viissiio

on

n o

orr iin

nssttrru

uccttiio

on

n..

W

WA

AR

RN

NIIN

NG

G

S

SA

AF

FE

ET

TY

Y H

HA

AZ

ZA

AR

RD

D!!

C

Ch

hiilld

drre

en

n ssh

ho

ou

ulld

d b

be

e ssu

up

pe

errv

viisse

ed

d tto

o e

en

nssu

urre

e tth

ha

att tth

he

ey

y

d

do

o n

no

ott p

plla

ay

y w

wiitth

h tth

he

e a

ap

pp

plliia

an

ncce

e..

Содержание P0V0 Series

Страница 1: ... working on the equipment observe all precautions in the literature and on the tags stickers and labels that are attached to the equipment November 2021 1 18 8 G GE E2 20 0D D1 1 1 1E E E EN N Modular Blowers No Heat P0V0A000M30SCA P0V0B000M40SCA P0V0C000M50SCA P0V0D000M50SCA The P0V0 series modular blower is designed for installation in a closet utility room alcove basement crawlspace or attic Th...

Страница 2: ...ti io on n t te es st ti in ng g s se er rv vi ic ci in ng g a an nd d t tr ro ou ub bl le es sh ho oo ot ti in ng g o of f t th hi is s p pr ro od du uc ct t C CA AU UT TI IO ON N I IM MP PR RO OP PE ER R V VO OL LT TA AG GE E C CO ON NN NE EC CT TI IO ON N F Fa ai il lu ur re e t to o f fo ol ll lo ow w t th hi is s C Ca au ut ti io on n c co ou ul ld d r re es su ul lt t i in n p pr ro op pe er...

Страница 3: ...o o t to o w ww ww w P P6 65 5W Wa ar rn ni in ng gs s c ca a g go ov v I Im mp po or rt ta an nt t Installation of this unit shall be made in accordance with the National Electric Code NFPA No 90A and 90B and any other local codes or utilities requirements N No ot te e The modular blowers have been evaluated in accordance with Intertek ETL UL1995 2011 Ed 4 SUITABLE FOR MOBILE HOME USE N No ot te ...

Страница 4: ...3 Panel Removal 13 Horizontal Installation in an Attic or Crawlspace 13 Duct Connections 14 Return Air Filters 23 Electrical Connections 25 Field Wiring 25 Integrated Modular Blower Control Menu 27 Integrated Modular Blower Control IMBC Display Codes 30 Fault Code Recovery 31 Sequence of Operation 32 Checkout Procedures 34 Table of Contents ...

Страница 5: ... Cabinet modular blowers BAYLIFTC Dual Return Kit C size extension C Cabinet modular blowers BAYLIFTD Dual Return Kit D size extension D Cabinet modular blowers BAYFLTR206 Filter Access Door Kit Downflow only All modular blowers in Downflow orientation BAYSF1165AA a 1 SlimFit Box with MERV 4 Filter All modular blowers BAYSF1255BA 1 SlimFit Filter and Insulated Frame All modular blowers when used i...

Страница 6: ...6 18 GE20D1 1E EN Location and Clearances Minimum clearance to combustible materials MODULARBLOWER O 21 O ...

Страница 7: ...dditional air flows Be sure to check the air flow and the temperature drop across the evaporator coil to ensure sufficient air flow 5 W Wi ir ri in ng g Consult all schematic and pictorial wiring diagrams of this unit and the outdoor equipment to determine compatibility of wiring connections and to determine specific requirements All field wiring to the modular blower should be installed in accord...

Страница 8: ...cedures p 34 9 M Ma ai in nt te en na an nc ce e The system air filter s should be inspected cleaned or replaced at least monthly Make certain that the access panels are replaced and secured properly before placing the unit back in operation This product is designed for dependable service however periodic maintenance should be scheduled and conducted by trained professional service personnel This ...

Страница 9: ...18 GE20D1 1E EN 9 Outline Drawings Table 3 14 5 Width Cabinet ...

Страница 10: ...10 18 GE20D1 1E EN Table 4 17 5 Width Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...

Страница 11: ...18 GE20D1 1E EN 11 Table 5 21 Width Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...

Страница 12: ...12 18 GE20D1 1E EN Table 6 24 5 Width Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...

Страница 13: ...ic should be on a service platform large enough to allow for proper clearances on all sides and service access to the front of the modular blower See Location and Clearances p 6 Line contact is only permissible between lines formed by intersections of the top and two sides of the modular blower casing and building joists studs or framing The modular blower may be placed horizontally in a crawl spa...

Страница 14: ...longer guide holes located on the modular blower flange 4 Seal per local codes and requirements Modular Blower in Horizontal Left with Coil 1 Bend modular blower flanges up 2 Support the modular blower and coil independently 3 Screw through the coil cabinet into the modular blower flange Guide holes are located on the coil Note There are no longer guide holes located on the modular blower flange 4...

Страница 15: ...modular blower 4 Seal per local codes and requirements Note Flat or dedicated horizontal coils may require flanges to be bent upward Downflow Modular Blower with Coil 1 Bend modular blower flanges down 2 Set the modular blower on top of the coil so that it is flush with the back of the modular blower 3 Seal per local codes and requirements G Ge en ne er ra al l I In ns st ta al ll la at ti io on n...

Страница 16: ...0D1 1E EN Horizontal Right and Downflow Modular Blower no Coil 1 Bend modular blower flanges up 2 Attach ducting 3 Seal per local codes and requirements G Ge en ne er ra al l I In ns st ta al ll la at ti io on n ...

Страница 17: ...ed separately An external overflow drain pan must be installed in all applications over a finished ceiling to prevent property damage Upflow Modular Blower with Bottom Return in Closet with Remote Filter 1 Remove the bottom plate 2 Set the modular blower on the base inside closet 3 Install remote filter 4 Seal per local codes and requirements Upflow Modular Blower with Bottom Return in Closet with...

Страница 18: ...ducted air from a remote location 3 Install filter at a remote location 4 Seal per local codes and requirements Upflow Modular Blower with Bottom Return Mounted on a Ducted Pedestal with Filter Box 1 Remove the bottom plate 2 Set the modular blower on the filter box The ducted pedestal will use ducted air from a remote location 3 Seal per local codes and requirements FILTER G Ge en ne er ra al l I...

Страница 19: ...l BAYLIFT kit to lift modular blower Follow kit instructions Note The modular blower bottom pedestal must be a minimum of 6 in height 3 Match the filter cabinet flush to the back and bottom sides of the modular blower cabinet and secure in place with screws 4 Mark the two areas to be cut out for the return air 5 Cut out the two sections of the cabinet and BAYLIFT kit to be removed 6 Attach ducting...

Страница 20: ...er with Two Side Returns Important One of the sides must have a transition to allow the thermostat wiring to exit the cabinet Important If a transition is not a viable option a hole will need to be drilled in the side of the cabinet for the thermostat wiring to exit Important Make sure not to cut the cabinet in the No Cut area Important Remove Blower Assembly and Panel Loop before cutting cabinet ...

Страница 21: ...he top of the modular blower 3 Install remote filter 4 Seal per local codes and requirements Downflow Modular Blower with Top Return and Plenum 1 Remove the top plate 2 Attach the plenum ducting to the top of the modular blower 3 Install remote filter 4 Seal per local codes and requirements G Ge en ne er ra al l I In ns st ta al ll la at ti io on n ...

Страница 22: ...nflow Modular Blower with Top Return and Plenum with Filter Box 1 Remove the top plate 2 Attach the filter box to the top of the modular blower 3 Attach ducting 4 Seal per local codes and requirements FILTER G Ge en ne er ra al l I In ns st ta al ll la at ti io on n ...

Страница 23: ...uld provide for installation of return air filters Important Remove Blower Assembly and Panel Loop before cutting cabinet to avoid cutting wires 1 Determine the appropriate position to set the modular blower in order to connect to existing supply and return ductwork 2 For upflow side return installations remove the insulation around the opening in the blower compartment 3 The side panels of the up...

Страница 24: ...the modular blower If only the front of the modular blower is accessible it is recommended that both supply and return air plenums are removable 3 When replacing an modular blower old duct work should be cleaned out Thin cloths should be placed over the registers and the modular blower fan should be run for 10 minutes Don t forget to remove the cloths before you start the modular blower 4 The hori...

Страница 25: ...rol IMBC and connect wiring 2 The factory Y1 O jumper must remain in place for proper LED read out in cooling mode 3 Y1 and Y2 wiring from the thermostat must connect to the IMBC for proper airflow and LED readout 4 Single compressor and two compressor airflow is auto matically set with the IMBC Menu optionsin ODU section 2 1 2 stage 1 compressor 1st stage airflow 80 2 2 2 stage 2 compressors 1st ...

Страница 26: ... COOLING HP D R B Outdoor Unit NOTES 1 Cut the BK jumper at the indoor unit After cutting the jumper power must be off or cycled on off on for the IMBC to work properly 2 Requires an 850 control with software version 3 0 or 1050 Not a valid combination with 950 control CPC CFM Ton cooling Must be set to 400 Control Board LED s will read CoF continous fan during cooling and heat pump operation 24 V...

Страница 27: ... 5T P0V0C 5T 5T 3 5T 4T 4 5T P0V0D 5T 5T 3 5T 4T 4 5T Designated Maximum 1st Stage Heat Pump Airflow Se ng ODU 2 1 1st stage airflow is 80 of the total airflow ODU 2 2 1st stage airflow is 50 of the total airflow Total airflow CPH x Tonnage 400 x 3 1200 Model Number Hea ng CFM P0V0A000M30SCA 1000 Total 1240 P0V0B000M40SCA 1200 Total 1440 P0V0C000M50SCA 1400 Total 1680 P0V0D000M50SCA 1400 Total 168...

Страница 28: ...layed is solely dependent on the input of 24VAC that is applied to the low voltage terminal strip 2 The status will alternate between the system mode and the airflow request every 2 seconds 3 If an error occurs an E will alternately flash with the system mode and airflow request 4 Some units will show demand airflow while others will show calculated airflow Calculated airflow will gradually ramp u...

Страница 29: ...sequence will repeat two more mes unless the Run Test Mode is exited see above Important The Run Test Mode does not bring the outdoor unit on It is designed to allow the technician to observe each mode to ensure the IMBC circula ng blower are performing as intended The run test for the blower will take approximately 70 seconds to begin Note During run test mode depressing the option key will allow...

Страница 30: ...lay Seconds 0dt Outdoor Tonnage 0du Outdoor Unit COF Blower Constant Fan Airflow Multiplier Percentage CpC Cooling CFM Ton CpH Heat Pump Heating CFM Ton Xod Not Applicable sd Not Applicable gXC Not Applicable run Run Test Mode Error Codes Alarm Error Code Alarm Explanation e0 Loss of the IRQ or other internal failures Internal IMBC error e6 Voltage reversed polarity e6 2 Bad grounding e 2 Open fus...

Страница 31: ...irms the faults have been cleared Resetting Factory Defaults 1 Display must be in Idle Mode 2 Push the Menu and Option buttons at the same time for 15 seconds then release 3 The 7 segment will flash FD 3 times This confirms the unit has been reset to the factory defaults Motor Communications Personality Module Low Voltage Terminal Strip 12 Pin Connector LINE Connections EAC HUM Dry Contacts Neutra...

Страница 32: ... unit via thermostat wiring 4 The indoor airflow ramps to 2nd stage cooling airflow The seven segment LED for example will read CL2 Cooling Stage 2 ARF Airflow 160 1600 calculated cfm value shown x 10 5 When the temperature is lowered enough to satisfy the thermostat setting contacts R Y1 Y2 G will open 6 The OD unit shuts off and the indoor blower shuts off unless a blower off delay has been enab...

Страница 33: ...ed enough to satisfy the thermostat setting contacts R Y1 Y2 G will open 6 The OD unit shuts off and the indoor blower shuts off The seven segment LED will read IDL Idle no thermostat demand S Se eq qu ue en nc ce e o of f O Op pe er ra at ti io on n ...

Страница 34: ...ltage and running current are within limits Ductwork is sealed and insulated Supply registers and return grilles are open unobstructed and air filter is installed Indoor blower and outdoor fan are operating smoothly and without obstruction Indoor blower motor set on correct speed setting to deliver required CFM Blower and fan set screws are tight Cover panels are in place and properly tightened Sy...

Страница 35: ...18 GE20D1 1E EN 35 N No ot te es s ...

Страница 36: ...plications For more information please visit www trane com or www americanstandardair com The manufacturer has a policy of continuous data improvement and it reserves the right to change design and specifications without notice We are committed to using environmentally conscious print practices 18 GE20D1 1E EN 22 Nov 2021 Supersedes 18 GE20D1 1D EN March 2021 2021 ...

Отзывы: