10
SSA-SVX06H-EN
Figure 4. Evaporator coil reorientation for TWE126, 150, 156, 180
Top bracket screws
Rotate 4°
clockwise
Preparation for Refrigerant Piping
N
NO
OT
TIIC
CE
E
E
Eq
qu
uiip
pm
me
en
ntt D
Da
am
ma
ag
ge
e!!
D
Do
o n
no
ott a
ap
pp
plly
y h
he
ea
att tto
o rre
em
mo
ov
ve
e sse
ea
all cca
ap
pss u
un
nttiill tth
he
e
g
ga
au
ug
ge
e p
po
orrtt cco
orre
ess h
ha
av
ve
e b
be
ee
en
n rre
em
mo
ov
ve
ed
d.. IIff sse
ea
all cca
ap
pss
a
arre
e iin
ntta
acctt,, a
ap
pp
plliicca
attiio
on
n o
off h
he
ea
att m
ma
ay
y g
ge
en
ne
erra
atte
e
e
ex
xcce
essssiiv
ve
e p
prre
essssu
urre
e iin
n tth
he
e u
un
niitt a
an
nd
d rre
essu
ulltt iin
n
d
da
am
ma
ag
ge
e tto
o tth
he
e cco
oiill o
orr e
ex
xp
pa
an
nssiio
on
n v
va
allv
ve
e..
The air handler is designed so that refrigerant piping
can enter from either the right or left hand side. It is
shipped with the intent that the refrigerant lines will
enter from the left hand side. To convert to right hand
entry, unbraze the elbow on the suction line and rotate
180° and rebraze.
IIm
mp
po
orrtta
an
ntt:: Access to refrigerant lines is limited in all
horizontal and some vertical applications.
Therefore, refrigerant lines should be
stubbed out and temporarily capped prior
to setting the air handler. Protect adjacent
surfaces from heat damage when brazing
in and around the air handler. See
, p. 12
.
Installations, Limitations and
Recommendations
N
NO
OT
TIIC
CE
E
S
Sy
ysstte
em
m C
Co
om
mp
po
on
ne
en
ntt D
Da
am
ma
ag
ge
e!!
P
Prro
op
pe
errlly
y iin
nssu
ulla
atte
e a
allll rre
effrriig
ge
erra
an
ntt g
ga
ass p
piip
piin
ng
g tto
o
p
prre
ev
ve
en
ntt p
po
ossssiib
blle
e w
wa
atte
err d
da
am
ma
ag
ge
e d
du
ue
e tto
o
cco
on
nd
de
en
nssa
attiio
on
n a
an
nd
d tto
o p
prre
ev
ve
en
ntt cca
ap
pa
acciitty
y llo
ossss a
an
nd
d
p
po
ossssiib
blle
e cco
om
mp
prre
esssso
orr d
da
am
ma
ag
ge
e..
The general location of the air handler is normally
selected by the architect, contractor and/or buyer. For
proper installation, the following items must be
considered:
•
Available power supply must agree with electrical
data on component nameplate.
N
No
otte
e:: Unit voltage cannot be changed on units
ordered with a VFD.
•
If external accessories are installed on the unit,
additional clearances must be provided.
•
All duct work should be properly insulated to
prevent condensation and heat loss.
•
Refrigerant gas piping must be insulated.
It is recommended that the outline drawings in the
Dimensional Data section be studied and dimensions
properly noted and checked against the selected
installation site. By noting in advance which features
are to be used, proper clearance allowances can be
made for installation and possible future service.
P
Prre
e--IIn
nsstta
alllla
attiio
on
n