62
RT-SVX063G-EN
Trane Startup Checklist
This checklist is intended to be a guide for the Trane
technician just prior to unit 'startup'. Many of the
recommended checks and actions could expose the
technician to electrical and mechanical hazards. Refer to
the appropriate sections in the this manual for appropriate
procedures, component specifications and safety
instructions.
Important:
This checklist is not intended as a substitution
for the contractor’s installation instruction.
Important:
Except where noted, it is implied that the Trane
technician is to use this checklist for
inspection/verification of prior tasks completed
by the general contractor at installation. Use
the line item content to also record the
associated values onto the Trane unitary
packaged equipment log.
Job Name
Serial #
Job Location
Model #
Sales Order #
Ship Date
Unit DL # (special units)
Date
Starting Sales Office
Technician
Table 27.
Startup checklist
Completed?
General Start-up
1
Is adequate access/egress provided?
Yes
No
2
Initial site inspection performed?
Yes
No
3
Unit exterior inspected for damage (dents, bends, missing panels, doors work properly)?
Yes
No
4
Unit clearances adequate to avoid air recirculation?
Yes
No
5
Verify crankcase heaters are working and on for 8 hours prior to unit start
Yes
No
6
Verify unit interior is free from debris and obstructions, etc.
Yes
No
7
All unit drain lines and traps are properly installed
Yes
No
8
Verify unit is grounded. Confirm a ground wire is coming from the power source
Yes
No
9
Verify main power feed wire gauge is properly sized for current load
Yes
No
10
Verify all wiring connections are tight
Yes
No
11
Verify all field control wiring for CV, SZVAV or VAV controls are complete
Yes
No
12
Verify hold down bolts from fan sections removed
Yes
No
13
Fan section isolators checked/adjusted (approximately ¼” gap above shipping block)
Yes
No
14
Verify compressor oil levels at proper levels
Yes
No
15
Compressor discharge service valves and optional suction service valves open/back seated
Yes
No
16
Verify fans rotate freely
Yes
No
17
Verify refrigerant charge on each circuit
Yes
No
18
Verify correct voltage supplied to unit and electrical heaters
Yes
No
19
Verify there are no unit phase monitor errors.
Yes
No
20
Verify all fans rotate in proper direction
Yes
No
21
Verify fan amperages within nameplate specs (please document on log sheet)
Yes
No
Unit Configuration and Setup
1
Verify model number in the UCM configuration matches unit model number on nameplate
Yes
No
2
Configure unit using IOM and critical control parameters using critical control parameters table
Yes
No
Air Cooled Condenser
1
All coil fins inspected and straightened
Yes
No
2
Condenser fans are rotating freely
Yes
No
3
Verify the fan blade set-screws to the motor shaft of the condenser fan assemblies are tight
Yes
No
Outside Air and Economizer (if applicable)
1
Verify damper linkages are tight/adjusted and tip seals are in good condition
Yes
No
2
Outside air pressure sensor installed and tubing connected to fitting on unit exterior
Yes
No
3
Duct pressure tubing connected to duct pressure sensor
Yes
No
4
Tubing from controlled space connected to space pressure fitting (StatiTrac)
Yes
No
Electric Heat (if applicable)
Содержание IntelliPak with Symbio 800
Страница 16: ...16 RT SVX063G EN Figure 1 20 to 30 ton front view inches 40 28 90 63 27 31 FRONT VIEW 20 30T Dimensional Data ...
Страница 18: ...18 RT SVX063G EN Figure 3 40 to 55 ton front view inches 27 31 40 28 90 63 FRONT VIEW 40 55T Dimensional Data ...
Страница 64: ...64 RT SVX063G EN Figure 37 Dry bulb changeover map Startup the Unit ...
Страница 137: ...RT SVX063G EN 137 Notes ...
Страница 138: ...138 RT SVX063G EN Notes ...
Страница 139: ...RT SVX063G EN 139 Notes ...