RT-SVX063G-EN
47
Figure 29.
Unit gas trains 500 MBh ultra modulating
Modulating valve
One stage valves
UL 536 Flexible
Metallic Hose
Manual shutoff
valve
1” field
connection elbow
Figure 30.
Unit gas trains 850/1200 MBh 4 stage/
modulating/ultra modulating
Modulating valve
(not on 4-stage)
One stage valve
UL 536 Flexible
Metallic Hose
UL 536 Flexible
Metallic Hose
Manual shutoff
valve
1-1/4” (850 MBh) /
1-1/2” (1200 MBh) field
connection elbow
One stage valve
One stage valve
One stage valve
Flue Assembly and Rain Shield
Installation
1. Locate the flue vent chimney, vent elbow, and, if
required, the rain shield in the supply fan section of the
unit.
Notes:
1. Remove shipping covers prior to installation.
2. Refer to installation instructions in RT-
SVN030*-EN for more detailed instructions.
2. Install the flue vent elbow onto the inducer motor
housing using the provided sealing caulk and screws.
3. Install the flue vent chimney to the exterior of the flue
post.
4. Install the rain shield (40-75 ton units only) over the
combustion intake slots on the exterior of the vented
access panel.
Gas Furnace Condensate Drain
Units equipped with a gas furnace have a 3/4" CPVC drain
connection stubbed out through the vertical support in the
Содержание IntelliPak with Symbio 800
Страница 16: ...16 RT SVX063G EN Figure 1 20 to 30 ton front view inches 40 28 90 63 27 31 FRONT VIEW 20 30T Dimensional Data ...
Страница 18: ...18 RT SVX063G EN Figure 3 40 to 55 ton front view inches 27 31 40 28 90 63 FRONT VIEW 40 55T Dimensional Data ...
Страница 64: ...64 RT SVX063G EN Figure 37 Dry bulb changeover map Startup the Unit ...
Страница 137: ...RT SVX063G EN 137 Notes ...
Страница 138: ...138 RT SVX063G EN Notes ...
Страница 139: ...RT SVX063G EN 139 Notes ...