RT-SVX063G-EN
3
WARNING
Follow EHS Policies!
Failure to follow instructions below could result in
death or serious injury.
•
All Trane personnel must follow the company’s
Environmental, Health and Safety (EHS) policies
when performing work such as hot work,
electrical, fall protection, lockout/tagout,
refrigerant handling, etc. Where local
regulations are more stringent than these
policies, those regulations supersede these
policies.
•
Non-Trane personnel should always follow local
regulations.
Overview of Manual
Note:
This document is customer property and must be
retained by the unit owner for use by maintenance
personnel.
This unit is equipped with Symbio 800 controls. Refer to the
“Start-Up” and “Manual Override” procedures within this
Installation, Operation, and Maintenance manual and the
latest edition of the appropriate programming manual for
Variable Air Volume (VAV), or Single Zone Variable Air
Volume (SZVAV) applications before attempting to operate
or service this equipment.
Important:
The procedures discussed in this manual
should only be performed by qualified and
experienced HVAC technicians.
This booklet describes proper installation, start-up,
operation, and maintenance procedures for applications.
By carefully reviewing the information within this manual
and following the instructions, the risk of improper
operation and/or component damage will be minimized.
Note:
One copy of the appropriate service literature ships
inside the control panel of each unit.
It is important that periodic maintenance be performed to
help assure trouble-free operation. Should equipment
failure occur, contact a qualified service organization with
qualified, experienced HVAC technicians to properly
diagnose and repair this equipment.
Important:
DO NOT release refrigerant to the atmosphere!
If adding or removing refrigerant is required, the service
technician must comply with all federal, state, and local
laws.
Copyright
This document and the information in it are the property of
Trane, and may not be used or reproduced in whole or in
part without written permission. Trane reserves the right to
revise this publication at any time, and to make changes to
its content without obligation to notify any person of such
revision or change.
Trademarks
All trademarks referenced in this document are the
trademarks of their respective owners.
Factory Training
Factory training is available through Trane University™ to
help you learn more about the operation and maintenance
of your equipment. To learn about available training
opportunities contact Trane University™.
Online:
Phone: 855-803-3563
Email:
Revision History
Updated Main Electrical Power in Installation chapter.
Содержание IntelliPak with Symbio 800
Страница 16: ...16 RT SVX063G EN Figure 1 20 to 30 ton front view inches 40 28 90 63 27 31 FRONT VIEW 20 30T Dimensional Data ...
Страница 18: ...18 RT SVX063G EN Figure 3 40 to 55 ton front view inches 27 31 40 28 90 63 FRONT VIEW 40 55T Dimensional Data ...
Страница 64: ...64 RT SVX063G EN Figure 37 Dry bulb changeover map Startup the Unit ...
Страница 137: ...RT SVX063G EN 137 Notes ...
Страница 138: ...138 RT SVX063G EN Notes ...
Страница 139: ...RT SVX063G EN 139 Notes ...